Series BE 22 SK
15Pages

{{requestButtons}}

Catalog excerpts

Series BE 22 SK - 1

SYSTEMS EN Manual Pneumatic Drilling Unit Series BE 22 SK Read this manual before installation and commissioning of the product. Keep for future reference.

Open the catalog to page 1
Series BE 22 SK - 3

DECLARATION OF INCORPORATION OF PARTLY COMPLETED MACHINERY ORIGINAL According to the EC's Machinery Directive 2006/42/EC, Annex 2B We, E2 Systems a division of Tubex AB Strömslundsgatan 3 507 62 Borås Sweden, declare that the partly completed machinery: Model: BE22x SK * Is designed to be embedded in a larger machinery or assembled with another machine, which together will constitute machinery covered by Directive 2006/42/EC "Machinery Directive" and which shall be constructed in compliance with this directive, and * Must not be put into service until the machinery, which the partly...

Open the catalog to page 3
Series BE 22 SK - 4

Table of content: Page: Information about the manufacturer 6 Description of the drilling unit 6 Installation of the drilling unit 7 Mounting of cutting tools 8 Spare parts drawing 13 Spare parts list 13, 14

Open the catalog to page 4
Series BE 22 SK - 5

WARNING! - Ensure that the operator has read and understood this manual before the drilling unit is in use. - For security reasons, any modification of the drilling unit and it’s accessories, which may affect product safety, must be approved by the manufacturers technical manager. - The unit is intended for drilling, countersinking and reaming and should not be used for any other application, unless approved by the manufacturers technical manager - Always follow local security regulations regarding installation, operation and maintenance. - The drilling unit must be securely fixed and the...

Open the catalog to page 5
Series BE 22 SK - 6

General recommendations - Apply a system for monitoring the tool in the machine. If no such system is at hand, we recommend user/operator to frequently control the tool. To ensure that no damages occurred. Thorough review of the unit Visual control of any outer damages. Ensure there is opportunity to fast turn of air-supply and run a normal cycle without tool and material (to avoid further damages at the material and unit). Listen for noise from bearings and also control the run-out at the spindle nose. If not ok, unit has to be repaired and a new control for damages will be necessary. If a...

Open the catalog to page 6
Series BE 22 SK - 7

Description of the drilling unit The BE 22 SK consist of an air motor, a gear box and a robust body. When you need a unit without a feed the E2 SK-units are a very good alternative. The design is compact as well as robust. BE 22 SK comes in a wide range of speeds. BE 22 SK is also available for lubrication-free operation. Type and speed: See data label on drilling unit Serial number: See data label on drilling unit Normal direction of rotation for the drilling units spindle is right-hand direction (clockwise). The drilling unit can be ordered as left-hand direction (anti-clockwise). The...

Open the catalog to page 7
Series BE 22 SK - 8

Installation of the drilling unit This Drilling and Tapping Unit is only intended for use in machinery which applies to the Machine Directive 2006/42/EC. This Drilling and Tapping Unit is designed for normal drilling, countersinking, reaming and tapping. In applications requiring high-precision hole placement or when drilling into rounded or slanted surfaces, drill bushings must be used. To be able to use the unit, it must first be installed and fitted with control equipment. Regardless of how simple the installation is performed, the unit must be fitted with necessary protective devices to...

Open the catalog to page 8
Series BE 22 SK - 9

Attachment Attach the drilling unit according to the below. The drilling unit can be mounted vertically or horizontally. Optional attachment should be discussed with E2's technician. Mounting of cutting tools The following cutting tools can be used with drilling unit: Drills, hole saws, core drills, shank end mills, countersinkers, reamers or broaches. The drilling unit can be fitted with either key chuck, collet chuck or multi-spindle head. Key Chuck: Collet Chuck: Multi-spindle head:

Open the catalog to page 9
Series BE 22 SK - 10

Maintenance instruction Daily check: - Check the air-pressure on the FRL-unit, 6 – 7 bar (87 – 101.5 Psi). Max 7 bar (101.5 Psi). - Check for any leakages of air. If a leakage is detected, contact service staff. Weekly check: - Check that the oil-mist lubrication is working, approx. 1 drop/10-20 cycles. 1 drop = 15 mm3 (.000528 fl.oz. (UK), .000507 fl.oz. (US)) - Check that the drilling unit is clean. Monthly check: - Check that no abnormal play is present in the drilling spindle. - Check that external silencer is not clogged. - Check that the air filter in the FRL unit is working or...

Open the catalog to page 10
Series BE 22 SK - 11

Power, air motor CC spindle spacing Run-out at spindle nose Working pressure range Air consumption Ambient temperature Sound level Spindle thread for chuck Chuck See Power table below. Single spindle min. 45 mm (1 3/4'') Double spindle head min. 11 mm (7/16'') Max. 0,03 mm (.001 In) 6 - 7 bar. Max 7 bar (85 - 100 Psi. Max. 101.5 Psi) < 0,3 Nm3/min (< 12 Cfm) + 10° - +40° C. (+50° - +104° F.) 70 dB(A) 3/8'' - 24 UNF As standard the drilling unit is fitted with an ordinary key chuck 0 0,5 - 6,5 mm (.02 - 1/4''). A larger key chuck and collet chuck with collets are availble as an option. Type...

Open the catalog to page 11
Series BE 22 SK - 13

Spare parts list BE 22 SK _4_1 Air motor for left-hand rotation, on request._ 4A_1 Set of vanes for oil lubricated air motor, pos. 4, complete. 4A_1 Set of vanes for non-lubricated air motor, pos. 4, complete. 4B_1 Set of ball bearings for air motor, pos. 4, complete._ _5_1 Wave spring, for old versions only._ 7_1 Wrench for Collet Chuck Nut pos. 6. ER11._ _7_1 Wrench for Collet Chuck Nut pos. 6. ER20._ 7_1 Wrench for Collet Chuck Nut pos. 6. ER32._ 8 1 Tool for chuck removal.

Open the catalog to page 13
Series BE 22 SK - 14

10_1 Planetary gear BE 225 SK, complete._ 10_1 Planetary gear BE 228 SK, complete._ 10_1 Planetary gear BE 2211 SK, complete._ 10_1 Planetary gear BE 2222 SK, complete._ 10_1 Planetary gear BE 2236 SK, complete._ 10_1 Planetary gear BE 2249 SK, complete._ 10_1 Planetary gear BE 22150, 22220 SK, complete._ 10A_1 Bearing kit for Planetary gear BE 225, 228, 2211 SK, complete. 10A_1 Bearing kit for Planetary gear BE 2222, 2236, 2249 SK, complete. 10A_1 Bearing kit for Planetary gear BE 22150, BE 22220 SK, complete. 15_1 Adaptor, for multi-spindle head VH04-. 15_1 Adaptor, for multi-spindle head...

Open the catalog to page 14

All E2 Systems catalogs and technical brochures

  1. Controls

    5 Pages

  2. Tool Holders

    3 Pages

  3. Series BE 21

    19 Pages

  4. E2-catalog

    30 Pages