Asphalt Production Technologies
52Pages

{{requestButtons}}

Catalog excerpts

Asphalt Production Technologies - 1

Asphalt Production Technologies

Open the catalog to page 1
Asphalt Production Technologies - 4

E-MAK new technologies are first tested under actual production conditions at Simge Group trial facilities for final improvement and then put on the market for sale

Open the catalog to page 4
Asphalt Production Technologies - 5

E-MAK, is the only asphalt plant manufacturer with its own trial facilities

Open the catalog to page 5
Asphalt Production Technologies - 6

Asphalt Recycling Systems: RATech RATech is integrated with asphalt plant by adding aggregate, bitumen and anti-aging into RAP material for bitumen base production. Megaton Brand new innovation project designed for E-MAK mining facility which can provide aggregate for asphalt plant, concrete plant, cold mix plant 24/7 simultaneously. It is an aggregate preparation-stocking -dosing system which includes re-crushing system. It is also environmentally friendly and energy saving system. Aggregate Modification Plant: Challenger Plus In addition to features of CHALLENGER, it diminishes...

Open the catalog to page 6
Asphalt Production Technologies - 7

E-MAK Production Standards E-MAK asphalt plants are produced under EU directives; Machine Safety Directive 2006/42/EC, Electromagnetic Compatibility 2004/108/EC and Low Voltage Directive 2006/95/EEC and in line with EN standards with its CE marking. Also; E-MAK proudly holds EAC- Eurasia Certificate of Conformity, ISO 9001 Quality Management Certificate and ISO 14001 _ Environmental Management System Certificates. Worldwide patented E-MAK's genuine technologies I 4th Eurasphalt & Eurobitumen Congress Innovation Session 'E-MAK Challenger Presentation' 5th Eurasphalt & Eurobitumen Congress...

Open the catalog to page 7
Asphalt Production Technologies - 8

As the first process of production all steel material used in the production is subjected to sandblasting (Sa 2 V2). After mechanical cutting and forming, sandblasted materials are cleaned using special solutions. Parts which are not subjected to welding process are coated (80pm). Parts which will be subjected to welding process are pre-coated (40pm) leaving the necessary surface for welding. All these processes are completed within 8 hours to prevent corrosion. After welding processes are over, the parts are re-cleaned, heated and pre-coated 80pm again for uniformed coating. The final...

Open the catalog to page 8
Asphalt Production Technologies - 9

High quality materials _I

Open the catalog to page 9
Asphalt Production Technologies - 10

E-MAK AT DIFFERENT PRODUCTION CONDITIONS AND LOCATIONS Germany Saudi Arabia

Open the catalog to page 10
Asphalt Production Technologies - 12

AFTER SALES Our customer oriented After Sales service with good service quality is the most important factor for our clients to choose E-MAK. • After -sales support includes technical information-consultancy, emergency consultancy line, on site assembly and dismantling, spare parts, repairing, revision and periodic maintenance • 7/24 customer support line • Mechanical, electrical, electronic experienced after-sales staff with efficient on-site service • Remote support service by online connection to asphalt plant automation • Fast and original spare parts guarantee with large spare parts...

Open the catalog to page 12
Asphalt Production Technologies - 13

+ Applied trainings under actual working conditions at our facilities

Open the catalog to page 13
Asphalt Production Technologies - 16

• Quick assembly • Easy transportation • Economic price • Totally enclosed mixing tower • Economic assembly in narrow space • Fits into containers • Economic price • High volume stocking capacity • Wide platform and ladders • Easy to integrate new technologies • In addition to Green Type features: • High volume hot aggregate bunker • Totally enclosed mixing tower • Able to stock 5 types of asphalt simultaneously • Batch or continuous type • Quick assembly • Easy transportation • High production capacity • Ideal for metropolitan cities • Quick mix design change via double sieve • Stocks 5...

Open the catalog to page 16
Asphalt Production Technologies - 17

BITUMEN TANKS • Electrical or hot oil heating • Vertical or horizontal type • Optionally with agitation shaft • 10-5000 ton capacity range MODIFIED BITUMEN (PMB) PLANT • Hot oil heated • Full or semi-automatic • Easy transportation and assembly • 8-20 t/h capacity BITUMEN EMULSION PLANT ASPHALT RECYCLING RATECH • Cold asphalt recycling • Warm asphalt recycling • Hot asphalt recycling • Hot oil heated • Full or semi-automatic • Easy transportation and assembly • 4-15 t/h capac

Open the catalog to page 17
Asphalt Production Technologies - 18

Cold aggregate silos are the starting point of asphalt production. E-MAK cold aggregate silos provide controlled, homogenous and continuous feed in required proportions for different aggregate types. Different aggregate types do not mix with each other. Widths of silos are suitable for loader and provides easy operation. Automation system links cold aggregate silos and hot aggregate bunker. Dosage speed is automatically adjusted. • 4 or more silos • In volumes between 8 m3 - 25 m3 • Feeding conveyor with inverter • Flow control system • Optic /acoustic warning system • Equipped with...

Open the catalog to page 18
Asphalt Production Technologies - 20

E-MAK dryers provide efficient aggregate drying and heating due to the specially designed angled shelves within the dryer with optimum heat transfer surface and minimum fuel consumption. The body and drive rings are held together with no welding (using bolts only) this avoids defects due to high and sudden temperature changes. The dryer is manufactured by material durable to wear and heat resistant. Dryer rings and rollers are made of special and long lasting forged steel. • Outer body is insulated with rock wool and stainless steel according to climate conditions • Durable to heat...

Open the catalog to page 20
Asphalt Production Technologies - 21

+ High drying efficiency

Open the catalog to page 21
Asphalt Production Technologies - 22

E-MAK vertical elevator is designed according to asphalt plant capacity. Vertical elevator transfers heated aggregate from the dryer to the sieving unit. For 300t/h and over capacities double body, heavy duty type elevators are used. • Gears are produced from special steel and hardened to be wear-resistant • Single or double row H type chain for heavy duty use • Bucket edges are reinforced with special steel strips to provide wear-resistance • Back stop lock to secure drive system • By-pass channel connected to hot aggregate silo • Elevator chain tension mechanism is either helical spring...

Open the catalog to page 22
Asphalt Production Technologies - 23

-1 Gearbox system for maintenance and restart when the plant is loaded _I Heavy duty type vertical elevator

Open the catalog to page 23

All E-mak catalogs and technical brochures

  1. Asphalt Plants

    20 Pages