Laying Instructions for System TYTON® SIT® / TYTON SIT PLUS®
5Pages

{{requestButtons}}

Catalog excerpts

Laying Instructions for System TYTON® SIT® / TYTON SIT PLUS® - 1

Laying instructions for ductile cast iron pressure pipes and fittings, equipped with Tyton SIT® TYTON SIT PLUS® thrust resisting joints 1

Open the catalog to page 1
Laying Instructions for System TYTON® SIT® / TYTON SIT PLUS® - 2

Laying instructions Tyton SIT® / TYTON SIT PLUS® General instructions Düker offers sealing and locking rings of the type Tyton SIT® for dimensions DN 80 up to DN 400. For laying pressure pipes and fittings with thrust resisting joint Tyton SIT® and/or TYTON SIT PLUS® (TSP®) the „laying instructions for ductile cast iron pressure pipes and fittings with TYTON®joint“ as well as special installation instructions of the pressure pipe manufacturer are to be observed. For the type TYTON SIT PLUS® (TSP®) these rings are available for dimensions DN 80 up to DN 600. Joint construction Tyton SIT®...

Open the catalog to page 2
Laying Instructions for System TYTON® SIT® / TYTON SIT PLUS® - 3

Application field Assembling steps Tyton SIT® Pipe wall thickness class Pipe wall thickness class 1. Clean the socket and the pipe spigot. 2. lean the Tyton SIT® / TYTON SIT PLUS® ring, fold according to C the illustration and insert into the socket. Ensure that the inner loop is located between two steel segments. Slightly lubricate the inner part of the inserted Tyton SIT® / TYTON SIT PLUS® ring. 3. ush the blue-striped (Tyton SIT®) / white-striped (TYTON SIT P PLUS®) profiled marking ring onto the cast iron pipe. This thrust resisting socket joint substitutes concrete anchoring blocks....

Open the catalog to page 3
Laying Instructions for System TYTON® SIT® / TYTON SIT PLUS® - 4

Marking of the installed thrust resisting joint Locking Tyton SIT® Alternate moving of levers draws the spigot into the socket Marking ring For permanent marking, we supply profiled rubber with blue (Tyton SIT®) and accordingly white (TYTON SIT PLUS®) stripes. Attention: After connecting both parts, the locking of the segments is to be accomplished by moving the levers in the opposite direction. The exact positioning of the Tyton SIT® / TYTON SIT PLUS® ring has to be checked by means of a suitable gauge on the whole circumference. Gauge Fixing of these marking rings should be in accordance...

Open the catalog to page 4
Laying Instructions for System TYTON® SIT® / TYTON SIT PLUS® - 5

Fittings and Valves Drainage Technology Engineering Glass Lining Technologies 08 / 10 · 732695 · Specifications subject to change without notice. Jobbing Foundry Düker GmbH & Co. KGaA Hauptstraße 39 - 41 D-63846 Laufach Phone +49 6093 87-0 Fax +49 6093 87-246 Internet: www.dueker.de E-Mail: info@duek

Open the catalog to page 5

All Düker GmbH catalogs and technical brochures

  1. WASSERSPIEGEL

    20 Pages

  2. 2015 Price List

    119 Pages

  3. BAV

    3 Pages

  4. TE

    11 Pages

  5. E series

    7 Pages

  6. BSV 90

    5 Pages