1. Catalogs
  2. Dow Corning
  3. Fast-cure structural sealant enables aggressive construction schedule
video corpo

Fast-cure structural sealant enables aggressive construction schedule

Fast-cure structural sealant enables aggressive construction schedule

Fast-cure structural sealant enables aggressive construction schedule

Product catalog summary
Project Overview: The construction of the Shopping Botucatu mall in southeast Brazil faced tight deadlines and a complex design. The mall's design included nonuniform trapezoidal frames, requiring the assembly and installation of 3,450 m² of glass, 3,900 m² of aluminum composite materials, and 27 tons of aluminum within four months.
Challenge: The project required a high-performance sealant that could cure quickly to meet the aggressive timeline. The initial sealant choice did not allow for the necessary cure time, prompting the need for a faster solution.
Solution: Dow Corning® 121 Structural Glazing Sealant was selected for its 24-hour cure time, which was crucial for meeting the project's timeline. This two-part silicone sealant provided the necessary bonding strength and expedited the construction process.
Key Participants: The project involved architect Holler Neto and construction company Incorbase Engenharia Ltda, with Maxxi Vidros e Esquadrias as the glazing contractor.
Product Benefits: The fast-curing sealant allowed for off-site assembly of façade components, reducing delays and enabling timely project completion. The sealant's easy application and quick curing were critical to the project's success.
Technical Support: Dow Corning provided technical support and training to ensure proper installation techniques, contributing to the project's success.
Conclusion: The use of Dow Corning® 121 Structural Glazing Sealant was pivotal in overcoming the project's challenges, demonstrating the importance of selecting appropriate materials and partners in construction projects.
See more

Catalog excerpts

Fast-cure structural sealant enables aggressive construction schedule-1

Fast-cure structural sealant enables aggressive construction schedule Case Study: Shopping Botucatu, Botucatu, São Paulo, Brazil While a range of sealants – including materials from Dow Corning, a wholly owned subsidiary of The Dow Chemical Company – was available per the project specification, the combination of the project difficulty and the extremely tight timing made the sealant selection critical. Dow Corning was selected because of the quality and reliability of its products. PRODUCT Dow Corning ® 121 Structural Glazing Sealant KEY PARTICIPANTS • Architect: Holler Neto, Incorbase Engenharia Ltda • Construction: Incorbase Engenharia Ltda • Glazing Contractor: Maxxi Vidros e Esquadrias Tight deadlines are typical in the construction industry. The project timeline for the construction of the new 38,206 m² Shopping Botucatu mall – located in southeast Brazil, about 225 km west of São Paulo – was particularly aggressive and further complicated by a bold but difficult design. Implementing this design in a timely manner would prove challenging. THE CHALLENGE Shopping Botucatu features a design that uses a nonuniform structure utilizing trapezoidal frames. The glass and aluminum structures were assembled by glazing contractor Maxxi Vidros e Esquadrias at its facilities using four-sided structural glazing and then transported to the shopping center for installation on the building. The project scope was large, including placement of 3,450 m2 of glass, 3,900 m² of aluminum composite materials (ACM) and 27 tons of aluminum. And time was short: Maxxi would have only four months for assembly and installation of the glass façade. Engineers initially selected a material that would meet the challenging design requirements, but the project timeline did not allow for the needed sealant cure time. Glazing contractor Maxxi Vidros e Esquadrias needed a solution that would provide the high-performance sealant requirements with a quicker cure mechanism. The answer to the challenge was found in Dow Corning® 121 Structural Glazing Sealant. With a 24-hour cure time, the two-part silicone sealant was ideal for the project, delivering the delicate bonding needed for the frame structure with a cure time that could meet the aggressive timeline. “The decision to use fast-curing Dow Corning® 121 Structural Glazing Sealant (as a replacement for a slowercuring sealant) was the determining factor for the success of the project,” said the engineer responsible for Maxxi. “The use of fast-curing silicone in large projects is a current trend in our country due to the immediacy of the completion of jobs and cash flow problems. Companies do not install glass prior to winning projects, and the façade assembly is executed within

 Open the catalog to page 1
Fast-cure structural sealant enables aggressive construction schedule-2

Use of fast-curing Dow Corning® 121 Structural Glazing Sealant enabled Maxxi Vidros e Esquadrias to quickly assemble the façade components off-site and transport them to the construction site without the long delays from traditional, slower-curing sealants, enabling the glazing contractor to complete construction in a timely manner. Supplied in an easy-to-use two-part cartridge, the unique 1-to-1 mix ratio sealant is quick and easy to apply – no specialized pumps or mixing equipment are needed. Because it’s fast-curing, projects can be completed in less time. This was critical in the case of...

 Open the catalog to page 2

Archived catalogs

  1. MOLYKOTE® 44

    2  Pages

  2. Automative

    4  Pages

  3. 2 part RTV

    6  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.
About DirectIndustry
DirectIndustry is a marketplace that offers B2B players a complete experience, from product sourcing to purchase. DirectIndustry is an entity of VirtualExpo Group.