1. Catalogs
  2. DAWSON CONSTRUCTION PLANT LIMITED
  3. Sheet pile heavy duty capping system

Sheet pile heavy duty capping system
1 /5Pages

Sheet pile heavy duty capping system

Sheet pile heavy duty capping system
1 /5Pages

Catalog excerpts

Sheet pile heavy duty capping system-1

SHEET PILE HEAVY DUTY CAPPING SYSTEM REDEB SUPPORT BRACKETS & MULTI PILE SOFFIT SHUTTERS SWL 10 Tonne Per Metre Dawson Construction Plant Ltd Chesney Wold, Bleak Hall, Milton Keynes MK6 1NE, ENGLAND Tel: (+44) 1908 240300 Fax: (+44) 1908 240222 E-Mail: [email protected] Website: www.dcpuk.com D.C.P. RESERVES THE RIGHT TO DISCONTINUE EQUIPMENT AT ANY TIME, OR CHANGE SPECIFICATIONS OR DESIGNS WITHOUT M:\Manuals\Development Manuals\Capping Equipment\HeavyDutyCapping\HDC2-ISSUE1.DOC NOTICE OR INCURRING OBLIGATIONS

 Open the catalog to page 1
Sheet pile heavy duty capping system-2

FEATURES The multi pile soffit shutters have 148 individual adjustable bars which follow the pile wall contour and do away with the need for profiled plywood in fills. Concrete can then be poured directly on top of these bars. The system is capable of carrying a maximum vertical load of 10 Tonnes per metre. Maximum pile depth of 2 metres from pile face can be cast. Redeb support brackets can be fitted onto flat or round pile faces. The brackets have been design with a minimum width of only 170mm. To fit brackets only a single Ø85mm hole has to be cut through the pile face. Redeb support brackets...

 Open the catalog to page 2

Archived catalogs

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.