Catalog excerpts
The Clayton Super Economizer The Advantages of the Clayton Super Economizer (SE) include: IMPROVED EFFICIENCY Provides an additional 3% to 4% thermal efficiency with additional 35% heating surface. RAPID PAYBACK As little as 15 to 18 months, depending upon fuel costs and operation. SIMPLE INSTALLATION No intervening stack connectors or additional support structure required. COMPACT DESIGN Integrally mounted to reduce installation costs and space requirements. AVAILABILITY Available on new units, 60 BHP and above, or in field retrofit kits. Steam Generator Model SE with Super Economizer Installed
Open the catalog to page 1The Clayton Super Economizer (SE) coil assemblies are constructed in a similar fashion to the main heating coil section. The typical SE coil assembly has six (6) coils enclosed in a carbon steel jacket surrounded by insulation and a sheet metal outer shell. Each coil is a spirally wound, tube section constructed of SA178 carbon steel tubing. The assembly is welded with clips and spacers in a monotube coil design to optimize heat transfer between combustion gas and water flow. Water flow in the SE section is counter to the exhaust gas flow, with the feedwater entering at the top and exiting...
Open the catalog to page 2All CLAYTON INDUSTRIES catalogs and technical brochures
-
Boiler Efficiencies
2 Pages
-
Skid-Mounted Steam Systems
4 Pages
-
Feedwater Pump
2 Pages
-
Steam Generator Brochure
12 Pages
-
PLC Control
2 Pages
-
SigmaFire Skid
2 Pages
-
Hotwell
2 Pages
-
Clayton EFC Water Softener
2 Pages
-
Steam System Rental
4 Pages
-
Low NOx Technology
4 Pages
-
Heat Recovery Booklet
38 Pages
-
Corporate Brochure
12 Pages