1. Catalogs
  2. Campisa
  3. PREFABRICATED PIT
video corpo

PREFABRICATED PIT

PREFABRICATED PIT

PREFABRICATED PIT

Product catalog summary
Overview: The document provides a detailed description of the construction and installation process for prefabricated pits used in dock levellers. It highlights the advantages of using prefabricated pits, such as quick construction, cost-effectiveness, and precision.
Specifications: The document lists various prefabricated pit codes (e.g., FVRN 2020P0, FVRN 2025P0) along with their dimensions. It specifies the width and length of dock levellers, front wall dimensions, and lifting cylinder centers for both swivelling and telescopic lip dock levellers.
Construction Procedure: The construction process involves several steps: building the front wall, filling the dock with compacted inert soil, recovering shuttering, digging the necessary room for the prefabricated pit, casting a thin reinforced slab, mounting the prefabricated pit, and casting the final pavement. The document emphasizes the simplicity and efficiency of these steps.
Standards and Certification: The company, Campisa Srl, is certified under UNI EN ISO 9001:2000, ensuring quality management standards are met.
Key Benefits: The use of prefabricated pits ensures a perfectly squared, clean, and finished pit without the need for additional masonry work. It allows for the dock leveller to be installed without being affected by concrete work, ensuring a clean installation.
See more

Catalog excerpts

PREFABRICATED PIT-1

Company Project Support After Market Educational News Contact us Extranet Electro-hydraulic dock levellers Pit making Dock house Bumpers Dock shelters Sectional overhead doors Console and centralization Cold storage Other equipment Light alloy platforms Accessories Casebook Loading bays Sectional overhead doors Fire retardant doors Flexible doors Folding doors PREFABRICATED PITS VIDEO Loading bays > Pit making > Prefabricated pit Docks for dock levellers without clearance for the tail-lift: the prefabricated pit, certainty of quick construction and perfection at a low price. The most simple and economic way to build a pit to install a CAMPISABROWN dock leveller, with the certainty to obtain a perfectly squared, clean and finished pit, consists in using a CAMPISA optional prefabricated pit. Easy to assemble in 20 minutes, supplied with brackets, the prefabricated pit allows to immediately cast the pavement, without subsequent masonry re-makes or perimetrical further finishing. The dock leveller is installed only at the end of all "wet trades" without being smeared by concrete, and with no need of further pit squaring. The sequence of the operations shows the fastness and the perfection of the result: instead of building the pit with reinforced concrete walls, it is only necessary to build the front wall, to fill up with compacted inert soil, install the prefabricated pits and cast the pavement. PREFABRICATED PITS Dimensions in mm of the pits for dock levellers with swivelling or telescopic lip, built with prefabricated pits Prefabricated pit code FVRN 2020P0 FVRN 2025P0 FVRN 2030P0 FVRN 2220P0 FVRN 2225P0 FVRN 2230P0 Dock leveller width 2000 2000 2000 2200 2200 2200 Dock leveller length 2000 2500 3000 2000 2500 3000 "A" 2000 2500 3000 2000 2500 3000 "B" 2040 2040 2040 2240 2240 2240 "C" 550 550 550 550 550 550 Front wall width LV 2380 2380 2380 2580 2580 2580 Front wall height HV 570 570 570 570 570 570 Lifting cylinder centre "D" swivelling lip dock leveller 600 880 1170 600 880 1170 Lifting cylinder centre "D" telescopic lip d.l. 530 660 970 530 660 970 CAMPISA "PREFABRICATED PIT" The movie shows the simplicity and the convenience of this essential tools A B C D E F G H I J Prefabricated pit Page 1 of 2 http://www.campisa.eu/loading-bays/pit-making/prefabricated-pit/index.aspx?m=53&... 08/11/2010

 Open the catalog to page 1
PREFABRICATED PIT-2

Site Map Web Agency THE RAPID AND SIMPLE CONSTRUCTION STEPS OF THE DOCK • The front wall A) with the necessary for the prefabricated pit opening is built, and closed with a recoverable shuttering B) • The dock is filled with compacted inert soil C) until level - 20 cm approx. • The shuttering B) is recovered and the room D) necessary to receive the prefabricated pit is easily dug into the compacted inert soil. Before laying it a thin reinforced slab is cast. • The prefabricated E) pit with the F) squaring jig is mounted, all brackets are opened, it is brought flush with the pavement level and...

 Open the catalog to page 2
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.