Catalog excerpts
…when it comes to quality! BMR GmbH
Open the catalog to page 11 General description 2 Savety instructions 3 Technical Data 4 Connector pin list 4.2 Connector cooling fluid 5 Block diagram 6 Display 7 Initial operation 8 Description of operation 9 Flow chart 10 Error messages 11 Installation 12 Service and care 13 Engineering detail 14 Shipment 15 Accessories 12 Other products of BMR GmbH
Open the catalog to page 3The cooling unit KG-T 500 is controlled by an internal microprocessor. It has been designed to run high speed spindles like in cool ambience conditions. You are able to use it nearly for all types of spindles and cooling blocks. The maximum range of spindle power is 2000W. The KG-T 500 has an integrated and intelligent cooling fluid control. It depends on the temperature of the cooling fluid. According to requirements the fan power will be set to get more or less cooling power. This system runs always in an automatic mode and the users do not need any setting before starting or during...
Open the catalog to page 42. Safety instructions In case of current overload or short circuit you have to be ensured, that the KG-T 500 will be disconnected to power supply. The cooling unit should never operate in an unsupervised run. Be careful by filling the tank of the KG-T 500. Wrong bearing fluid should be immediately taken off by a sponge or a try cloths. Before filling the KG-T 500 with cool fluid, please check the power supply. It should be separated from the cooler und control the de-energized mode of the system. Before starting the KG-T 500 please check all screw connection, cables, pipes and gaskets. Use...
Open the catalog to page 5Connector pin list 4.1 Connector electric Pinning of Control-Connector X1 (female) Pin 1: Relay normally open (NO) Pin 5 Pin 2: Relay collective contact Pin 6 Pin 3: Relay normally close (NC) Pin 7 Status of KG-T500: Relay contact on connector X1 S Connector X1 digital signals: X1/4: GND (internal 0V) X1/5: Input start signal X1/6: Output power supply S Mains voltage: input voltage: 100 ... 250 VAC 4.2 Connector cooling fluid Connector A1 Flow forward (fluid to spindle) Connector A2 Flow return (fluid from spindle) connector A3 Fill port info: The...
Open the catalog to page 6forward flow return flow KG-T500 schematic power supply 10 interface error relais control signals (start/stop) error relais pins
Open the catalog to page 7On the front panel you have a 16x2 LCD display which shows all modes of the KG-T 500. All these messages are possible: BMR GmbH KG-T500 Vers:1.3 Software Version Typ of cooler Ready mode (waiting for a start signal): Operating time: OPERATING-HOURS: 124 h 23 min Minutes (0 – 59 min) Hours (max. 60.000 h)
Open the catalog to page 8Fanpower (30 – 100%) Temperatures: Return Tr and Air Ta ERROR! FAN STOP Check FAN Error message: FLOW ERROR! NO FLOW Check FLOW Flow is less than 0,5l/min Error message: Over temperature Fluid temperature to high Follow-up timer No start signal, autocontrol activ …when it comes to quality! BMR G
Open the catalog to page 97. Initial operation At first, check the KG-T 500 for external damages of transport. Connect the fluid pipes of the spindle with the KG-T 500 : · Fluid from the KG-T 500 to the spindle set on connector 1 (Flow forward) · Fluid from the spindle to KG-T 500 set on connector 2 (Flow return). DANGER: Before filling the tank with cool fluid, please check the power supply. It should be separated from the cooler unit and control the de-energized status of the system. Now open the tank and fill it to its maximum level. Be careful by doing this. Now use the BMR power cable to set the main supply of...
Open the catalog to page 108. Description of operation After power on the KG-T 500 shows the software version on the display. After a few seconds the operating hours appear on the LCD. When you can read „KG 500 IS READY“ the initiation has been finished. The KG-T 500 is ready to start. The status relay will be energized until the system is ready or in a cooling process. In an error case the status relay will be de-energized. You need an external start signal on connector X1/5 to start cooling process. If there is no start signal the KG-T500 will be set into a standby mode. The fan power depends on the temperature...
Open the catalog to page 11When an error appears, it's shown on a blinky display and you can hear an alarm signal. Until an error exists the status relay will de-energized. The relay is connected to X1 pin1-3. You have to analyse the reason for the error and you have to eliminate it quickly. When error has been removed the message on the display will be cleared automatically. If there is no more error the status relay will be energized again. The cooling capacity of the KGT 500 stands during an error message not fully available! The cause of the error should be rectified immediately. Error message on...
Open the catalog to page 1311. Installation To assembly the KG-T 500 into a spindle system you need a horizontal under-floor. We allow an addiction to the horizontal of maximum 10°. More addiction may be causes failure of fluid run. Leakage fluid can damage the KG-T 500. The aspirating holes of the cooling unit are on the floor panel. When they are closed the cooling power of the KG-T 500 will be decrease and the efficiency factor decreases, too. Keep them always clean and open. The air delivery ports are on the rear side. Please keep a distance of minimum 10 cm to a wall. The coolant hoses should be kept as short as...
Open the catalog to page 14Power Switch Fluid Level Control C = 41,5mm Deepness = 340mm (without any connectors) …when it comes to quality! BMR GmbH
Open the catalog to page 15Desktop Device
Open the catalog to page 1614. Scope of delivery 1 x Cooling Unit KG-T 500 1 x Plug connector (7 pins female) 2 x Male coupling NW5 / DN5 for coolant hose (6mm inside diameter) 1 x Hooper 1 x 2 liter freezing agent or concentrate for 2l 1 x power cable 15. Accessories S 1l freezing agent S Male coupling NW5(0 6mm diameter) S Male coupling NW5(0 8mm diameter) S Male coupling NW5(0 9mm diameter)
Open the catalog to page 17ONE PRODUCT IS NOT ENOUGH MORE PRODUCTS OF BMR GMBH Sealing Air Follow-Up Control Nominal voltage: Start input voltage: Power consumption: Relay details: Accu: Als Option ist ein Fernsteuer-Adapter zum direkten Anschluss an das I/O Interface an der Stiftleiste SL2 verfügbar. The solution for monitoring and control of the sealing air of the machine Life time extension for all spindles operated in wet ambient conditions Protection against dripping fluids even at power off by sealing air overshoot time Full control for integration into PLC by I/O On option a remote controller is available...
Open the catalog to page 18All BMR GmbH catalogs and technical brochures
-
Catalogue
52 Pages
-
SFU 0102
28 Pages
-
SFU 400
15 Pages
-
SFU 0303
56 Pages
-
SFU 0103/0203
30 Pages
-
SFU 0303
56 Pages
-
SFU0300
24 Pages
-
SFU-ErrorFlags
7 Pages
-
RS232 Control Commands
6 Pages
-
DressView
32 Pages
-
Folnet P S / P S 300
8 Pages
-
Folnet P
8 Pages
-
Folnet3-NT
8 Pages
-
Folnet 1 NT
8 Pages
-
Folnet 1
8 Pages
-
Folinv 12/3
4 Pages
-
SFU 0401
10 Pages
-
SFU 0302 19”
28 Pages
-
SFU 0302 SSE
30 Pages
-
SFU 0101/0201
17 Pages
-
SFU 0100
2 Pages
-
SFU 0303/4
48 Pages
-
SFU 0303/2
50 Pages
-
SFU0052
12 Pages
-
SFU 0200/1
24 Pages
-
SFU 0103
24 Pages
-
SFU 0156
20 Pages
-
SFU 0150
20 Pages
-
SFU 0102/0202
28 Pages
-
KG-T 500
20 Pages