LEAD SYSTEMS
1 /8Pages

LEAD SYSTEMS

LEAD SYSTEMS
1 /8Pages

Catalog excerpts

LEAD SYSTEMS-1

Vertical Configuration Aft Batter Below Grade Side Batter Forward Reach Raised Leads Above Grade Forward Batter

 Open the catalog to page 1
LEAD SYSTEMS-2

INTRODUCTION Located in Hamilton, Ontario, Canada, Berminghammer Foundation Equipment is a manufacturer of advanced foundation equipment with over 50 years of experience. The company is represented in more than 40 countries world wide, maintains an extensive Research and Development team and has earned a reputation for finding the most practical solutions to the most challenging projects. The Vertical Travel Lead, referred to as "VTL" system, was first developed and patented by C.W. Berming-ham in thel960's. This lead system was developed in response to the fundamental limitations found in a...

 Open the catalog to page 2
LEAD SYSTEMS-3

LEAD SPECIFICATIONS           ·        ·  ·  ·        ·  ·  ·  HYDRAULIC SPOTTERS Precise control of the hydraulic cylinders from within the crane cab gives precise placement of piles during driving. Both 2 and 3-stage spotters provide a wide range of sizes...

 Open the catalog to page 3
LEAD SYSTEMS-4

LEAD STYLES Vertical Travel Free Floating Fixed Underhung

 Open the catalog to page 4
LEAD SYSTEMS-5

Berminghammer Leads have been designed to increase the productivity of the pile driving operation. This is accomplished by minimizing the movement of the crane, and by decreasing the time spent placing the pile under the hammer and spotting of the pile. On a typical project, the actual productive driving time may be increased from an average of 50% of the work day to 75% or more. The daily cost of the Vertical Travel Leads is less than the daily cost of a four-man crew and swinging/ hanging lead. The VTL contractor will begin to save after nine months. An additional cost benefit will resulit...

 Open the catalog to page 5
LEAD SYSTEMS-6

Berminghammer employs a staff of licensed civil, geotechnical, and mechanical engineers as well as draftsmen, designers and technicians. These professionals provide the highest level of technical expertise in the design and engineering of Berminghammer lead systems. To supplement our years of experience the Berminghammer engineering staff use state-of-the-art design tools such as the latest versions of CAD software including 3-D modeling and finite-element analysis. Berminghammer engineers also make use of field instrumentation and laboratory experiments to refine and optimize the design of our...

 Open the catalog to page 6
LEAD SYSTEMS-7

L-27 VTL for Rock Socket Drillin

 Open the catalog to page 7
LEAD SYSTEMS-8

ACCESSORIES AND INNOVATIONSPower Pack Brackets Allows a power pack to be mounted to the rear of the crane Utilizes existing crane hydraulics to run Ber-minghammer VTL functions Allows a customer to utilize an existing Vibro powerpack to run Berminghammer VTL functions Allows for guided precise utilization of a vibratory hammer. controlled / tensioned release of the wick drain Put any tool on Berminghammer Leads For pre-drilling before driving concrete piles For very long lead set-ups the, the rig-up hinge design removes the need for a support

 Open the catalog to page 8

All BERMINGHAMMER catalogs and technical brochures

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.