Project Overview
Voyants Solutions Limited Partnership undertook the redevelopment of Gwalior Railway Station in India, aiming to transform it into a transportation hub and tourist attraction. The project, valued at USD 61.23 million, required integrating the station's historical elements with modern design, while ensuring operational continuity during construction.

Design and Technology Implementation
Voyants utilized Bentley's Building Information Modeling (BIM) applications, including MicroStation, OpenBuildings Designer, and STAAD.Pro, to optimize the design process. The use of these tools facilitated the creation of a comprehensive 3D model, enabling efficient design modifications and real-time coordination among multidisciplinary teams.

Challenges and Solutions
The project faced constraints such as maintaining station operations and accommodating existing infrastructure. Voyants addressed these by employing offsite fabrication and onsite assembly techniques, supported by STAAD's structural analysis capabilities. The design incorporated a lightweight shell structure with modular arches, balancing historical aesthetics with modern functionality.

Sustainability and Environmental Considerations
Sustainability was a key focus, with design features aimed at reducing heat gain by 40% and maximizing natural light. The project included waste management systems and efficient irrigation to minimize environmental impact, contributing to the economic and social growth of Gwalior City.

Outcomes and Benefits
The use of Bentley's digital tools resulted in a 30% reduction in resource hours and a 500% return on investment. The project demonstrated the effectiveness of integrated BIM workflows in delivering high-quality, sustainable infrastructure solutions.

Conclusion
Voyants' innovative approach, supported by Bentley's applications, successfully met the project's design and operational challenges, setting a benchmark for future infrastructure projects.
See more

Catalog excerpts

Voyants Implements Collaborative Digital Workflows to Design Iconic Station for Indian Railways-1

CASE STUDY Bentley -' Advancing Infrastructure Project Summary Organization Voyants Solutions Private Limited Solution Buildings and Campuses Location Gwalior, Madhya Pradesh, India Project Objectives • Develop an iconic design to complement the existing historic Gwalior Railway Station that will serve as a tourist attraction and transportation hub for the city. • Generate a comprehensive master infrastructure plan that meets design and construction requirements. • Deliver a 3D model of a sustainable conceptual design within a tight timeline. Project Playbook MicroStation®, OpenBuildings™ Designer, STAAD®, STAAD.Pro® Fast Facts • Voyants implemented a coordinated 3D digital approach to design the iconic USD 61.23 million Gwalior Railway Station. • MicroStation and OpenBuildings Designer facilitated parametric modeling and streamlined workflows. • Integrating STAAD.Pro for structural design and analysis enabled the team to optimize use of the limited space and ensure platforms remain operational during construction. Working in Bentleys digital integrated design platform saved 30% in resource hours and achieved a 500% return on investment. Bentley's interoperable applications industrialized BIM workflows to deliver a high-quality, cohesive, and sustainable design. Voyants' sustainable design solution reduced heat gain of the building by 40%. Voyants Implements Collaborative Digital Workflows to Design Iconic Station for Indian Railways Bentley's BIM Applications Resolve Project Constraints and Save 30% in Resource Hours An Integrated Urban Railway Redevelopment As part of its redevelopment initiatives, Indian Railway Stations Development Corporation Ltd. (IRSDC) selected Gwalior Railway Station in central India as one of the rail stations to be renovated to serve as a transportation hub and enhance passenger-related amenities. The existing railway station sits in front of the historic Gwalior Fort between the old city of Gwalior to the west and the new settlement to the east, and the new design had to reflect a connection between these areas. IRSDC hosted an international design competition to develop and submit a 3D model of proposed designs to win a contract. Voyants Solutions Limited Partnership entered its submission and won the Gwalior station project with an iconic design that complemented the existing station and served as a tourist attraction. The USD 61.23 million railway redevelopment project required segregating pedestrian and traffic movement and multimodal integration to encourage sustainable transit and commercial growth. Specifically, the proposed design needed to integrate the heritage of the old station with a contemporary design to embrace both the traditional and modern aspects of Gwalior City. In addition to meeting the conceptual design requirements, Voyants faced technical and site constraints within a short timeline. The multidiscipline team needed to ensure that all platforms along the rail line remained fully operational throughout construction. Additionally, the design needed to accommodate the existing, fixed track alignment and utilities. Optimizing Conceptual Design Voyants used building information modeling (BIM) workfIows to optimize building design and incorporate existing structures. The proposed conceptual design retains the existing building, extended wings, and prominent arched architectural style, using the arch as a basis for adding a lightweight, shell structure. The new concept captures the historical character of the old station, which remains a focal point, while bringing new light to the railway complex through the modular system of three-dimensional symmetrical arches. A subtle backdrop to the old station, the design scheme creates a new identity for the entire facility using cantilevers and open spaces, and it enhances passenger access and connectivity. An optimum combination of design and structure, "the design is seen as a melting pot of old and new and responds to the same in architectural style," explained Upendar Rao Kollu, managing director at Voyants Solutions. To prepare its 3D design submission, Voyants used Bentley's interoperable BIM and analysis applications. The team designed the structure in MicroStation and STAAD.Pro and used OpenBuildings Designer to construct a comprehensive digital engineering model. Using the parametric modeling, analysis, and simulation features of Bentley's technology simplified design intent to optimize design based on the requirements. The interoperability of MicroStation made it possible to have plug-ins for third-party applications to create the 3D arches. Bentleys integrated design applications facilitated a high-quality, 3D deliverable with a cohesive scheme within the limited time frame. The team rendered 3D animations, generated walkthroughs, and extracted the 3D physical printed model from the BIM model. Overcoming Site Constraints As design consultants, Voyants was responsible for designing a structure and development plan that specifically accommodated the challenging requirement of keeping the existing station fully operational during construction. The team used STAAD to formulate the design, considering the limited space and time available for the columns and foundations that had to be constructed on existing platforms. Using the software, Voyants determined that it could meet these specifications and overcome site constraints with a framed structure, where multiple components could be fabricated offsite and placed in position with the help of cranes. The construction team would cast the pile foundations in-situ, using auger boring and self-compacting concrete. To optimize structural integrity, the team performed structural analysis and extracted reinforcement details, considering the dynamic effects of railway track vibration. Relying on STAAD's global design standards and specifications ensured

 Open the catalog to page 1
Voyants Implements Collaborative Digital Workflows to Design Iconic Station for Indian Railways-2

"Innovative designs need innovative applications. Bentley applications have allowed the multidiscipline team to workon a single platform and create iconic designs." - Upendar Rao Kollu, Managing Director, Voyants Solutions Find out about Bentley at: www.bentley.com Contact Bentley 1-800-BENTLEY (1-800-236-8539) Outside the US +1 610-458-5000 Global Office Listings www.bentley.com/contact compliance with local fire codes. STAAD facilitated design, modeling, and analysis and. as part of the BIM workflow. enabled designers to accommodate technical challenges and site constraints. The team is taking...

 Open the catalog to page 2

All Bentley Systems Europe B.V. catalogs and technical brochures

  1. ConstructSim

    2  Pages

  2. promis•e

    2  Pages

  3. STAAD.Pro

    2  Pages

Archived catalogs

  1. Water modelling

    24  Pages

  2. RAM CADStudio

    2  Pages

  3. Bentley MAP

    2  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.