Pestech International Improves Design Time by 50% and Saves MYR 200,000 on Substation Expansion
2Pages

{{requestButtons}}

Catalog excerpts

Pestech International Improves Design Time by 50% and Saves MYR 200,000 on Substation Expansion - 1

CASE STUDY Project Summary Organization Pestech International Berhad Solution Reality Modeling Utilities Transmission and Distribution Location Banting, Malaysia Project Objectives • Extend 2-by-500 kilovolt-diameter substations at Olak Lempit in Banting from a 500-kilovolt substation to meet increased demand for power. • Implement a 3D modeling solution to replace traditional CAD-centric design processes. Products Used OpenBuildings™ Designer, Bentley Raceway and Cable Management, Bentley Substation, ContextCapture, LumenRT, Navigator, ProjectWise®, Promis.e® Pestech International Improves Design Time by 50% and Saves MYR 200,000 on Substation Expansion Substation and Transmission Line EPC Contractor Leverages Bentley Substation for Project Coordination and Collaboration Fast Facts • Pestech International was awarded an RM 79.5 million power system installation contract to upgrade the Olak Lempit substation in Banting. • The team created an intelligent primary and secondary equipment library using Bentley Substation as the main design application. • 3D models were constructed with multiple levels to visualize the substation and detect and resolve clashes using Navigator. The project team created construction drawings in one day with Bentley Substation, compared to 10 days using traditional methods. Accurate measurements of cables and electrical components reduced waste by 10 to 20 percent. Working in a comprehensive modeling environment using Bentley's automated and interoperable software saved an estimated MYR 200,000. Boosting Power to an Underserved Area The power transmission and products business segment of Pestech International Berhad specializes in the manufacture and installation of high-voltage substations, transmission lines, underground cables, and equipment for utility companies in Asia. The organization leverages its broad experience in this field to successfully deliver projects on time and under budget. Pestech International focuses on emerging and developing countries that aim to advance their commitment to deliver reliable power and electric services to their citizens. The company provides power and transmission services within its home base of Malaysia as well as 20 other countries, including Cambodia, Papua New Guinea, and the Philippines. In 2017, Malaysia's largest utility company Tenaga Nasional Berhad (TNB) awarded Pestech International an RM 79.5 million power system installation contract to expand 2-by-500 kilovolt-diameter substations at Olak Lempit in Banting from a 500-kilovolt substation to provide power to the rapidly growing area. The project consists of supplying, erecting, and commissioning 2-by-1,050 MVA autotransformers, 500-kilovolt switchgears, 275-kilovolt switchgears, and ancillary equipment with associated civil works for the main Olak Lempit intake substation. The substation is strategically located 30 minutes from Malaysia's largest international airport and 45 minutes from Klang, the country's busiest shipping port. The site is a former palm oil plantation that is now an industrial zone with various plants and manufacturing facilities. Traditional CAD-centric Design Slows Production Among the challenges the project team faced was accessing the site without disrupting neighboring villages and plantations. The team also had to coordinate with another main contractor to deliver a separate section to the substation bays, and they had to utilize existing cable trays, ladders, and underground trenches laid by the other contractor from the existing control building. Working within a tight timeline and with a limited budget, Pestech International needed to coordinate its labor resources with the other projects on which the organization was simultaneously working. Lastly, because TNB expected a high-quality design, Pestech International needed to deviate from a traditional CAD-centric design and implement a 3D modeling environment. Because CAD-centric design processes focus on delivering standard design drawings through independent drafting efforts, such as single-line, physical layout, schematics, panel layout, and wiring diagrams, the drawings are frequently drafted by separate departments using different applications. CAD-centric design typically slows the design progress and prevents collaboration, which results in countless hours spent manually translating drawings for consistency, finding errors, managing changes across multiple drawings, and creating reports like bills of material and cable schedules. Moreover, this approach leaves corporate best-practice standards in the hands of the designer, which often results in inconsistency and poor quality across drawings and projects. Bentley's automated and interoperable solutions enabled greater project team collaboration, faster project delivery, lower costs, and quicker approvals. Reality Modeling Helps Avoid Clashes and Change Orders To overcome these challenges and maintain the project schedule, Pestech International deployed Bentley's 3D modeling solutions, comprising OpenBuildings Designer, Bentley Substation, Bentley Raceway and Cable Management, ContextCapture, and LumenRT. Using Bentley Substation as the main design application, the team created an intelligent standard primary and secondary equipment library,

Open the catalog to page 1
Pestech International Improves Design Time by 50% and Saves MYR 200,000 on Substation Expansion - 2

"Bentley solutions were implemented throughout this project, with Bentley Substation used for primary and secondarydesign and Bentley Raceway and Cable Management forcable routing design. Using symbol libraries and report templates, we were able to easily produce design drawings in 2D and 3D and automatically generate the reports." - Sean Lee, Assistant Manager, Pestech International containing symbols, macros, titles blocks, device families, and manufacturer information. The contents of this library are used to generate reports and collaborate with other project team members. At the end of...

Open the catalog to page 2

All Bentley Systems Europe B.V. catalogs and technical brochures

  1. ConstructSim

    2 Pages

  2. promis•e

    2 Pages

  3. STAAD.Pro

    2 Pages

Archived catalogs

  1. Bentley MAP

    2 Pages