Optioneering Helps MidCoast Water Transform Gloucester Water Network into a Reliable, Efficient System
2Pages

{{requestButtons}}

Catalog excerpts

Optioneering Helps MidCoast Water Transform Gloucester Water Network into a Reliable, Efficient System - 1

CASE STUDY Project Summary Organization: MidCoast Water Solution: Water and Wastewater Location: Gloucester, New South Wales, Australia Project Objective: Design and construct an improved water system for Gloucester that: • Meets levels of service and ensures that residents experience adequate, reliable water pressure. • Has lower operations and maintenance costs than the existing system. Products used: Fast Facts • Gloucester residents were experiencing pressure fluctuations and the water supply system relied entirely on booster pumps. • MidCoast Water assessed over 100 what-if scenarios in WaterGEMS to optioneer a solution. • The optimal selected solution will increase service levels, while decommissioning most of the pumps and reducing operations and maintenance costs. ROI • Capital investments: The selected optimal solution has the lowest net present value (at 4 percent) over 50 years. This is AUD 300,000 lower than the status quo option. • Operations and maintenance costs: Annual costs will be reduced by over 75 percent. • Project delivery: Using WaterGEMS, MidCoast Water saved as much as AUD 79,300 in concept work costs. Optioneering Helps MidCoast Water Transform Gloucester Water Network into a Reliable, Efficient System WaterGEMS Helps Identify a Solution to Increase Service Levels and Reduce Operations and Maintenance Costs by Over 75 Percent MidCoast Water delivers water and sewerage services to 40,000 households in the Manning, Great Lakes, and Gloucester communities of New South Wales in Australia. It also supplies 8 billion liters of water a year to Karuah in the south, Crowdy Head in the north, and Gloucester in the west. In 2011, MidCoast Water accepted responsibility for the operation of the aging water and sewer networks in the Gloucester Shire Council area. The Gloucester water distribution network, parts of which date back to 1914, involves three reservoirs and seven booster pumps. Residents experienced water pressure fluctuations as the entire water system relied on booster pumps, which switched on and off based on downstream pressures. A combination of pump and pipe failures also caused outages. At one point, many residents remained without sufficient water for a couple of days, with 11 main breaks and one leak reported in Gloucester over a 24-hour period. MidCoast Water sought to find a solution that would increase the residents’ level of water services while reducing the system’s reliance on booster pumps. This would subsequently reduce the ongoing energy use required to operate the system. Using WaterGEMS, MidCoast Water was able to assess over 100 what-if scenarios and to select the optimal solution that would improve the network performance while minimizing energy use. Water Network Engineering Challenges The Gloucester water network stretches north to south over a very hilly 15 kilometers, with elevations spanning over 60 meters. The highest points in the system are the northern and southern extents, with some additional intermediate high points. None of the three existing reservoirs is at a sufficient elevation to provide adequate pressure to all Gloucester residents. Currently, seven booster pumps are required to provide adequate water pressure. Without the pumps, most residents would have reduced water pressure, and some residents would have no water at all. Water pressure provided by booster pumps is not as reliable as pressure provided by a reservoir at sufficient elevation. According to the Water Services Association of Australia (WSAA) Water Supply Code, booster pumps should only be used to boost pressure and should not be the only means of supplying water to the required service levels. The existing water system also contains nearly 30 kilometers of asbestos cement pipe that was installed between the 1930s and 1980s. The pipe is currently being replaced, but this project will take many years. Because of the poor condition of much of the pipe, pressures within the system must be maintained at relatively low levels (compared to the usual maximum desirable pressure), adding another constraint to the solution design. Hydraulic Model Construction Made Easier MidCoast Water used the asset information contained in its database to develop a hydraulic model using WaterGEMS’ ModelBuilder function. The water network asset information obtained upon handover of the Gloucester Water system to MidCoast Water was patchy, with some missing and incorrect data, including elevations, pipe materials, and diameters. Missing elevations were addressed using WaterGEMS’ TRex feature for terrain elevation extraction, together with halfmeter contours obtained by aerial laser survey. Tracey Hamer, planning engineer at MidCoast Water explained: “This provided a sound basis for developing a working hydraulic model. WaterGEMS, and its powerful database, was used to create, analyze, and compare various scenarios, including future demand and fire-flow scenarios.” Optioneering for Optimal Decisions To determine the best solution, MidCoast Water used WaterGEMS to develop over 100 what-if scenarios – assessing various combinations of reservoir heights, pressure reducing valve locations, and water demands. With WaterGEMS, Midcoast Water could compare the energy use of various options, including doing nothing – even though this was not a viable option. WaterGEMS also analyzed various options with large water reservoirs at varying elevations and varying numbers of pressure reducing valves (PRVs) placed within the system. The options with a higher reservoir

Open the catalog to page 1
Optioneering Helps MidCoast Water Transform Gloucester Water Network into a Reliable, Efficient System - 2

“Using information from the WaterGEMS model has allowed MidCoast Water to select a sustainable, optimized water distribution strategy for the Gloucester water network, which will transform the customer experience and ensure that levels of service are met, now and into the future.” – Tracey Hamer, Planning Engineer, MidCoast Water required more PRVs (due to the number of pressure zones within the system) and so had higher ongoing energy costs and carbon emissions, due to the increased energy required to pump water up to the reservoir. The WaterGEMS Scenario Comparison feature helped MidCoast...

Open the catalog to page 2

All Bentley Systems Europe B.V. catalogs and technical brochures

  1. ConstructSim

    2 Pages

  2. promis•e

    2 Pages

  3. STAAD.Pro

    2 Pages

Archived catalogs

  1. Bentley MAP

    2 Pages