Catalog excerpts
Project Summary Organization: Medabil Sistemas Construtivos S.A. Solution: Structures Location: Sao Paulo, Brazil Project Objective: • Develop a steel/composite structural solution for WTorre Morumbi, a 170,428-square-meter building comprised of two 38-floor towers connected by five walkways. • Achieve maximum optimization of the structure and standardization of the design despite an uncommon geometry. Products used: RAM Medabil Streamlines Geometric Design of WTorre Morumbi with BIM Advancements Bentley's Interoperable RAM Software Helps Reduce Design Time and Project Costs on Brazil Office Building Fast Facts • The ability to integrate the RAM structural model for calculation with the SRS/2 detailing software facilitated comparative studies and ensured an efficient, secure flow of information. • Medabil demonstrated a differentiated and cost-effective approach in the design of the WTorre Morumbi, which provided 94,000 square meters of leasable area. • Achieving LEED Silver certification drove decisions related to sustainability, such as choice and interventions on the plot, economy and rational use of water, choice and use of materials, internal air quality, and rational use of energy. Bentley's collaborative, interoperable software enabled Medabil to reduce basic and detailed design work by 65 percent. RAM analysis optimized the use of materials, reducing weight by 15 percent and project costs by approximately 50 percent. A 45 percent reduction in engineering lead time for design and detailing helped to optimize the project work schedule. Structural Solutions for Uncommon Geometry Medabil Sistemas Construtivos S.A. (Medabil) was contracted to develop the structural design for the WTorre Morumbi building, located in the fastest growing business region of Sao Paulo, Brazil. With two 38-floor towers interconnected by five steel bridges spanning up to 35 meters, the innovative design required two structural systems—one for horizontal stability and one to absorb the gravitational loads. Medabil implemented RAM, Bentley's fully integrated application for the design of steel and concrete structures, to perform collaborative modeling, engineering, and analysis. The final design accommodated the geometry and positioning of the suspended walkways while providing safe solutions for stability and gravitational load support. Using RAM to optimize the materials for this hybrid structure reduced project costs by an estimated 50 percent. WTorre Morumbi Challenge Designed by the architects Aflalo / Gasperini Arquitetos and constructed by WTorre Engenharia, the WTorre Morumbi building comprises 170,428 square meters of built area. The project's goals were to develop a steel/composite structural solution that also optimized and standardized the structure, all while reducing lead time needed for the design, detailing, and erection. As a leader in the design, fabrication, and erection of steel structures in Brazil and overseas, Medabil had the expertise in innovative constructive solutions required to achieve these goals. Medabil addressed several structural design challenges associated with the WTorre Morumbi building. Foremost was the uncommon geometry and positioning of the five suspended walkways, which exhibited independent Medabil implemented a BIM methodology to address WTorre Morumbi s unique design challenges, including the uncommon geometry and positioning of five suspended walkways. behavior affected by wind pressure and the relative displacement between the towers, especially at the top of the building. The structural design team was also challenged to resolve how the reinforced concrete cores of each tower would ensure horizontal stability and delimit vertical movement. Developing in an Integrated BIM Environment Using RAM software, Medabil implemented a BIM methodology to develop the entire project. Numerous 3D models were created for the design of the steel walkways to determine the optimal structural solution for each individual walkway. Wind tunnel test data was input to the RAM model to refine the tower stabilization measures. The solution was to equip the interconnecting structures with special fixtures to provide support and anchoring, while allowing for compatible horizontal movement and common displacement between the towers. To hoist and mount the 60- to 150-ton walkways over 40 meters high within the spatial confines of the towers, Medabil employed a system that could lift, and then rotate each structure upon reaching its final position. The multi-discipline project team used RAM to perform and validate calculations for both the metal and reinforced concrete components of the structural systems. The stabilization system in each tower relied upon the reinforced concrete core to provide lateral stability, and used composite beams, concrete columns, and steel deck slabs to provide gravitational load support. To optimize the construction schedule, Medabil used a temporary isolated metal frame during the assembly phase that rose up to six floors above the last level of concrete.
Open the catalog to page 1“RAM software played a key role in streamlining these solutions based on overall cost. Through its easy-to-use interface and great ability to review solutions, we could make comparative studies in record time. Its interface with the detailing program added a lot of quality to the process, ensuring a fast and secure flow of information.” — Marcos Banhato, Engineer, Medabil Sistemas Construtivos S.A. Find out about Bentley at: www.bentley.com Contact Bentley 1-800-BENTLEY (1-800-236-8539) Outside the US +1 610-458-5000 The concrete cores and periphery pillars were poured using high-strength...
Open the catalog to page 2All Bentley Systems Europe B.V. catalogs and technical brochures
-
Digital Airport Project Showcase
18 Pages
-
Water_Hazelwood_Coal_Mine
2 Pages
-
Water_Simtejo_case_study
2 Pages
-
Wimbledon Stadium_Case Study
2 Pages
-
WSP-Shard_Case_Study
3 Pages
-
Bentley’s Water Project Showcase
92 Pages
-
Mine Water Software Solution
4 Pages
-
AutoPLANT Equipment V8i
2 Pages
-
AutoPLANT Piping V8i
2 Pages
-
ConstructSim
2 Pages
-
promis•e
2 Pages
-
Bentley Datasheets
2 Pages
-
Making PDS Interoperable
17 Pages
-
Bentley OpenPlant PowerPID
2 Pages
-
STAAD.Pro
2 Pages
Archived catalogs
-
Water modelling
24 Pages
-
Bentley Water V8 XM
2 Pages
-
Bentley Cadastre Specsheet
2 Pages
-
STAAD Foundation
2 Pages
-
RAM CADStudio
2 Pages
-
Bentley MAP
2 Pages
-
Bentley Structural Brochure
2 Pages
-
Bentley Project Yearbook 2006
82 Pages
-
Bentley SewerCAD
2 Pages
-
Bentley WaterCAD
2 Pages
-
Bentley WaterGEMS
2 Pages
-
Bentley HAMMER
2 Pages
-
Bentley StormCAD
2 Pages
-
Bentley SewerGEMS
2 Pages
-
Bentley AutoPlant P&ID
2 Pages
-
Bentley Microstation
2 Pages
-
Bentley Architecture
2 Pages
-
Bentley ProjectWise brochure
2 Pages
-
Bentley CivilStorm
2 Pages
-
Bentley ProjectWise
4 Pages
-
Bentley PowerDraft
2 Pages
-
Bentley AutoPipe Specsheet
2 Pages