LLC Volgogradnefteproekt Reduces Annual Operations Cost of Offshore Oilfield Project by 30 Percent
2Pages
Catalog excerpts
CASE STUDY Project Summary Organization: LLC Volgogradnefteproekt Solution: Offshore Location: Astrakhan, Astrakhan Region, Russia Project Objective: • Prepare 2D and 3D documentation for the construction of seven facilities within the Vladimir Filanovsky gas and oil field in the Caspian Sea. • Create an as-built digital model for asset lifecycle information management, consolidating engineering data from contractors who used disparate applications. • Design a unit-conductor that conforms to Russian Federation standards. Products used: AECOsim Building Designer, AssetWise ALIM, Bentley Raceway and Cable Management, MicroStation®, Bentley Navigator, Navigator Mobile, OpenPlant Modeler, ProjectWise®, Promis.e®, ProSteel, ProStructures, STAAD® Fast Facts • Bentley’s asset information management application was used for trusted information exchange and 3D digital engineering modeling. • AssetWise leveraged a connected data environment to facilitate interoperability of multiple data sources from various file formats. • Increasing the quality and accessibility of its asset information will reduce human error and industrial disasters. ROI • Bentley solutions decreased project costs by enabling met deadlines and reducing rework. • Search and data exchange time was cut by 30 and 70 percent, respectively; document coordination increased 25 percent. LLC Volgogradnefteproekt Reduces Annual Operations Cost of Offshore Oilfield Project by 30 Percent Volgogradnefteproekt Delivers As-built 3D Information Model, Unifying Project Data in a Connected Data Environment With AssetWise Creating a Single Source of Information A leading independent design firm serving the oil and gas industry in southern Russia, LLC Volgogradnefteproekt was retained to deliver an as-built 3D digital model for the seven platforms commissioned for the Vladimir Filanovsky offshore field in the Caspian Sea. Volgogradnefteproekt implemented Bentley’s AssetWise platform to create a connected data environment that would support asset lifecycle information management and provide a single source for project and asset information from six different companies involved in designing the oil field infrastructure. By using the digital model of the oil field during all stages of this RUB 125 billion project, Volgogradnefteproekt expects that the field’s annual operating costs will be reduced by 30 percent. Consolidating Engineering Data The Vladimir Filanovsky field is located about 50 kilometers off the northern shore of the Caspian Sea at depths of 7 to 11 meters. LUKOIL discovered the multi-reservoir field in 2005 and put the first stage of development into operation in 2016. As one of Russia’s largest offshore fields, the oil-gascondensate reservoirs hold 153.1 million tons of oil reserves and 32.2 billion cubic meters of gas reserves. The field’s second stage of development involves the construction of seven complex facilities, designed by six different companies. The client needed a process for managing engineering and technical information at all stages of the project, from verifying that the technical designs met project requirements, through planning construction schedules, and managing the logistics of materials and equipment delivery. With multiple contractors and subcontractors participating in the project, the client also needed to produce high-quality construction documents and monitor as-built work against the plan. Volgogradnefteproekt was tasked with preparing 2D and 3D documentation for each of the seven platforms and consolidating the engineering data to create a unified, as-built 3D digital model of the field. To streamline collaboration and data management, the project team created a single source of data that provided information mobility for the client’s multioffice design team. In addition to the as-built data model, Volgogradnefteproekt was also responsible for the technical design of a unit-conductor to be used for oil well drilling and extraction. The risk of human errors and industrial accidents that could endanger workers during construction was reduced as a result of the accessibility to operational information. Managing Asset Information Working with a tight deadline imposed by the client and regulated by the government of the Russian Federation, project participants simultaneously did their design work on the various infrastructure assets for the second stage of development of the oil field. Volgogradnefteproekt used AssetWise ALIM to consolidate the engineering data from the different contractors, each of whom were using a variety of different engineering applications from different software vendors, including AVEVA, Autodesk, and Bentley. Creating the connected data environment enabled trusted information exchange among the dispersed project teams. From the collected data, the project team built an informationrich 3D digital model of the oil field infrastructure that corresponded with the as-built facilities. This solution provided accurate decision-support for the engineering, construction, operations, and maintenance teams. Seamless Data Exchange Volgogradnefteproekt also used Bentley design applications for the unit-conductor. Engineers from multiple disciplines exchanged data seamlessly usi
Open the catalog to page 1"Using Bentley software solutions for design purposes produces a higher level of work organization and implementation" — Vasily Vasilievich Kalinin, FirstDeputy, LLC Volgogradnefteproekt Find out about Bentley at: www.bentley.com Contact Bentley 1-800-BENTLEY (1-800-236-8539) Outside the US +1 610-458-5000 Global Office Listings www.bentley.com/contact Bentley Raceway and Cable Management, OpenPlant Modeler, ProSteel, Promis.e, and other Bentley applications. The software provided access to Russian databases of equipment, codes, and standards, helping designers meet the Russian government's...
Open the catalog to page 2All Bentley Systems Europe B.V. catalogs and technical brochures
-
Digital Airport Project Showcase
18 Pages
-
Water_Hazelwood_Coal_Mine
2 Pages
-
Water_Simtejo_case_study
2 Pages
-
Wimbledon Stadium_Case Study
2 Pages
-
WSP-Shard_Case_Study
3 Pages
-
Bentley’s Water Project Showcase
92 Pages
-
Mine Water Software Solution
4 Pages
-
AutoPLANT Equipment V8i
2 Pages
-
AutoPLANT Piping V8i
2 Pages
-
ConstructSim
2 Pages
-
promis•e
2 Pages
-
Bentley Datasheets
2 Pages
-
Making PDS Interoperable
17 Pages
-
Bentley OpenPlant PowerPID
2 Pages
-
STAAD.Pro
2 Pages
Archived catalogs
-
Water modelling
24 Pages
-
Bentley Water V8 XM
2 Pages
-
Bentley Cadastre Specsheet
2 Pages
-
STAAD Foundation
2 Pages
-
RAM CADStudio
2 Pages
-
Bentley MAP
2 Pages
-
Bentley Structural Brochure
2 Pages
-
Bentley Project Yearbook 2006
82 Pages
-
Bentley SewerCAD
2 Pages
-
Bentley WaterCAD
2 Pages
-
Bentley WaterGEMS
2 Pages
-
Bentley HAMMER
2 Pages
-
Bentley StormCAD
2 Pages
-
Bentley SewerGEMS
2 Pages
-
Bentley AutoPlant P&ID
2 Pages
-
Bentley Microstation
2 Pages
-
Bentley Architecture
2 Pages
-
Bentley ProjectWise brochure
2 Pages
-
Bentley CivilStorm
2 Pages
-
Bentley ProjectWise
4 Pages
-
Bentley PowerDraft
2 Pages
-
Bentley AutoPipe Specsheet
2 Pages