1. Catalogs
  2. Bentley Systems Europe B.V.
  3. HEEC Pilots 3D Digital Design Standards to Deliver Miluo Western 220-kilovolt Substation

HEEC Pilots 3D Digital Design Standards to Deliver Miluo Western 220-kilovolt Substation

HEEC Pilots 3D Digital Design Standards to Deliver Miluo Western 220-kilovolt Substation

HEEC Pilots 3D Digital Design Standards to Deliver Miluo Western 220-kilovolt Substation

Product catalog summary
Introduction
The State Grid Corporation of China initiated a pilot project to implement 3D digital design standards for lifecycle management of substations, with the Miluo Western 220-kilovolt substation as the first to use 3D digital modeling throughout its lifecycle. Located in Hubei province, this project aims to enhance the power grid structure and reliability for 160,000 residents.

Project Challenges and Solutions
The project faced challenges due to a complex surrounding landscape and a compressed footprint. POWERCHINA Hubei Electric Engineering Co., Ltd. (HEEC) used Bentley's integrated digital applications to overcome these challenges, employing reality modeling, BIM, and simulation technologies to optimize design and construction.

Reality Modeling and Visualization
HEEC utilized oblique photogrammetry and ContextCapture to create a 3D reality mesh, providing a digital context for planning. This approach helped optimize the substation layout, reducing land occupation by 22% and saving CNY 2.5 million.

Collaborative Design Optimization
Using Bentley's applications, HEEC established a connected data environment to streamline workflows and avoid design collisions, saving CNY 800,000. The interoperability of these applications facilitated coordinated digital design, saving 65 design days.

Construction Management
The 3D design model, combined with reality modeling, formed a digital twin for the substation, aiding in construction management. Mobile applications and SYNCHRO for 4D sequencing improved on-site workflow, allowing the project to be completed 30 days ahead of schedule.

Digital Twin Implementation
By creating a digital twin, HEEC reduced the project's total investment by CNY 6.3 million. The digital twin supports efficient operations and maintenance, setting a precedent for future State Grid projects.

Conclusion
This pilot project demonstrated the benefits of using 3D digital design standards and digital twins, improving design productivity and providing technical support for construction, operations, and maintenance.
See more

Catalog excerpts

HEEC Pilots 3D Digital Design Standards to Deliver Miluo Western 220-kilovolt Substation-1

CASE STUDY Project Summary Organization: POWERCHINA Hubei Electric Engineering Co., Ltd. Solution: Communication and Utilities Location: Miluo City, Hunan, China Project Objectives: • To deliver a substation digital twin in accordance with the State Grid’s design standards. • To optimize construction management throughout the substation’s lifecycle with a BIM design model. • To improve operations and maintenance with digital twins that facilitate virtual reality scenes. Project Playbook: Bentley Raceway and Cable Management, OpenUtilities Substation, ContextCapture, LumenRT, MicroStation, Navigator, OpenBridge, OpenBuildings Designer, OpenPlant, ProjectWise, Promis.e, ProSteel, ProStructures, STAAD, SYNCHRO Fast Facts • Bentley’s reality modeling, BIM, construction simulation and visualization applications helped to overcome site constraints and optimize planning and construction. • Adopting digital twins industrialized project delivery, supporting construction, operations and maintenance. ROI • Creating the project’s digital context to optimize substation layout reduced land occupation by 22%. • Performing dynamic construction simulation enabled delivery of the substation project one month ahead of schedule. • Leveraging Bentley software to create digital twins provided an integrated 3D solution for collaborative management, saving CNY 6.3 million. HEEC Pilots 3D Digital Design Standards to Deliver Miluo Western 220-kilovolt Substation Establishing Digital Twins with Bentley Applications Improved Substation Designers’ Productivity, Saving CNY 6.3 Million A Lifecycle 3D Digitalization Initiative The State Grid Corporation of China is developing and promoting 3D design standards to digitalize processes for lifecycle substation management throughout the country. The Miluo western 220-kilovolt substation is the organization’s CNY 120 million pilot initiative, and the first substation to use 3D digital modeling throughout construction, operations, and maintenance. Located in the Hubei province of China, the substation will significantly improve the grid structure in the Miluo area, covering 16-square kilometers and enhancing the reliability of power supplied to 160,000 residents. POWERCHINA Hubei Electric Engineering Co., Ltd. (HEEC) won the bid as lead designer to implement 3D collaborative modeling in accordance with the State Grid’s design standards and to deliver digital twins to the owner. The project presented numerous site challenges, including a complex-surrounding landscape lined with large residential houses that restricted the layout of the substation facility. To accommodate the compressed footprint, the spatial location of each asset type – including underground works, building structures, electrical equipment, and cable trenches – required multiple contributing engineering disciplines in close collaboration. Working against an aggressive 10-month schedule to complete construction, HEEC had to effectively coordinate with each construction organization to safely deliver the project on time. Faced with these design and construction difficulties, the team required integrated BIM, reality modeling, and simulation and visualization technology to apply 3D digital standards and achieve full lifecycle digitalization. site and corridor planning. “ContextCapture generates highprecision reality models automatically and can visually reflect various information to help make decisions,” said Wei Wang, executive assistant, senior engineering at HEEC. Compared to traditional 2D drawings, using Bentley’s reality modeling application provided reliable environmental information to rationalize the substation layout amid the constrained site. HEEC relied on the accuracy of the 3D reality model to visualize and analyze the existing conditions, optimizing the incoming and outgoing corridor lines while also minimizing impact on agricultural land and houses bordering the substation. Using the reality mesh enabled the team to avoid demolishing six houses and reduce the area occupied by the substation by 22%, saving 0.94 hectares when compared to the original design scheme. As a result, HEEC saved CNY 2.5 million through the optimal substation layout and reduced earthworks for bored and cast-in-place piles by 63 cubic meters to save an additional CNY 90,000. Optimizes Collaborative Design The compressed substation layout, while optimal from an environmental and residential perspective, required multiple engineering disciplines to collaborate to avoid collisions in the tight space. To ensure reliable, quality, detailed 3D design, Reality Modeling Uses Digital Context for Immersive Visualization To accurately plan the project, HEEC used oblique photogrammetry, captured using an unmanned aerial vehicle, and ContextCapture to survey the substation site and generate a 3D reality mesh. Using geospatial reality modeling helped establish a digital context for the project, visually capturing landscape, vegetation, rivers, lakes, roads, and houses surrounding the project area to support substation Image courtesy of POWERCHINA HEEC, Ltd. Aerial image capturing helped to establish a digital context for the project, vis

 Open the catalog to page 1
HEEC Pilots 3D Digital Design Standards to Deliver Miluo Western 220-kilovolt Substation-2

“The pilot program implemented standards during construction that helped to improve design quality and set a great example for using digital twins to support future state grid projects.” – Wei Wang, Executive Assistant, Senior Engineering, POWERCHINA Hubei Electric Engineering Co., Ltd. Find out about Bentley at: www.bentley.com Contact Bentley 1-800-BENTLEY (1-800-236-8539) Outside the US +1 610-458-5000 Global Office Listings www.bentley.com/contact HEEC established an open, connected data environment, and reengineered the design process using Bentley’s integrated digital applications. ProjectWise...

 Open the catalog to page 2

All Bentley Systems Europe B.V. catalogs and technical brochures

  1. ConstructSim

    2  Pages

  2. promis•e

    2  Pages

  3. STAAD.Pro

    2  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.