1. Catalogs
  2. Bentley Systems Europe B.V.
  3. Foth’s Designs First Multi-lane Roundabouts in Iowa

Foth’s Designs First Multi-lane Roundabouts in Iowa

Foth’s Designs First Multi-lane Roundabouts in Iowa

Foth’s Designs First Multi-lane Roundabouts in Iowa

Product catalog summary
Project Overview: Foth Infrastructure & Environment, LLC, utilized Bentley Civil Software to design Iowa's first multi-lane roundabouts on NW 62nd Avenue in Johnston, Iowa. The project aimed to manage increased traffic due to DuPont Pioneer's headquarters expansion, securing USD 6.38 million in state funding.
Key Innovations: The project was completed in just six weeks, leveraging Bentley's interoperability, automated plan preparation, and customized inspection reporting. The use of GEOPAK Civil Engineering Suite and other Bentley products facilitated a fast-track schedule and efficient design process.
Design and Implementation: The design included four multi-lane roundabouts, a two-lane bridge, and a box-culvert underpass. GEOPAK tools were used for modeling, and the master model was created for plan preparation. The project also prioritized flood protection and pedestrian safety, using FlowMaster and CulvertMaster for hydraulic analyses.
Automation and Efficiency: Automated processes reduced plan preparation time by 24 days, saving USD 23,100. The design team used 3D models to streamline detailing, significantly reducing manual drafting time and errors.
Economic and Safety Impact: The project was completed under budget, with the low bid 20% below the estimate. The roundabouts are expected to reduce traffic fatalities by 90%, injuries by 76%, and crashes by 35%, while saving USD 1,500 per day in travel time and USD 3,600 per day in fuel consumption.
Conclusion: Foth's innovative use of Bentley software resulted in a successful, efficient design with lasting community and environmental benefits.
See more

Catalog excerpts

Foth’s Designs First Multi-lane Roundabouts in Iowa-1

CASE STUDY Project Summary Organization: Foth Infrastructure & Environment, LLC Solution: Roads Location: Johnston, Iowa, United States Project Objective: • Widen and reconstruct nearly 1.5 miles of NW 62nd Avenue in Johnston, Iowa, to manage travel demand through 2032. Bentley Civil Software Powers Foth’s Design of Bentley InRoads First Multi-lane Roundabouts in Iowa ® Powerful tools forPractices Leverage GEOPAK Civil Engineering Suite to Foth’s Innovative the design of civil infrastructure Deliver Plans in Just Six Weeks Headquarters Expansion Fuels Traffic • Design and construct a series of four multi-lane roundabouts to improve safety, increase travel speeds, and reduce travel time and fuel consumption. DuPont Pioneer retained Foth Infrastructure & Environment, LLC, to secure funding for widening and reconstructing nearly 1.5 miles of NW 62nd Avenue in Johnston, Iowa, where the company’s world headquarters is expanding. The initiative led to design and construction of a series of four multi-lane roundabouts—the first in the state—to address challenging traffic conditions. Three key areas of innovation enabled Foth to design and deliver the USD 7 million fast-track project on schedule: interoperability of Bentley products, automation of plan preparation, and customization of inspection reporting. Products used: Bentley OnSite, Bentley View™, CulvertMaster, FlowMaster, GEOPAK Civil Engineering Suite, LEAP Bridge, MicroStation, StormCAD Foth Senior Technology Manager Blaine Buenger said, “By combining Bentley solutions with Foth’s exceptional technical staff and innovative spirit, we delivered the project to the client on time, on budget, and with advanced, sustainable electronic deliverables.” • Secure two Revitalize Iowa’s Sound Economy grants totaling USD 6.38 million in state funding. Fast Facts • Foth’s 12-member team designed and sent the project out for bid in just six weeks. • A Bentley SELECT subscription provided easy access to the product portfolio, helping with workload balancing. • Foth maximized the benefits of product interoperability by using GEOPAK in conjunction with other civil software. Fast-track Schedule Drives Design In early 2010, DuPont Pioneer announced to city and state officials that two campus expansions would create 638 new jobs, contributing to a significant increase in traffic on NW 62nd Avenue. Foth led a collaborative effort among the City of Johnston, the Johnston Economic Development Company, and DuPont Pioneer to complete two Revitalize Iowa’s Sound Economy grants and secure USD 6.38 million in state funding for improving the corridor. • Innovative plan preparation trimmed 24 days from the schedule, saving USD 23,100. Given the existing traffic characteristics and imminent congestion, Foth saw an opportunity to implement a non-traditional intersection solution. Multi-lane roundabouts improve traffic flow, reduce delays, and promote pedestrian safety while presenting a smaller carbon footprint. Because this type of roundabout was new to Iowa, Foth was challenged to demonstrate the benefits to stakeholders. MicroStation® was used extensively to prepare conceptual drawings and preliminary geometric layouts. These illustrations assisted with educating city staff, city councilmen, and key stakeholders about the benefits of the proposed solution. • The low bid of USD 7 million was 20 percent below the estimate and 0.2 percent lower than the next lowest bid. Once approved, the project was put on a fast-track schedule, making it imperative for Foth’s multi-discipline 12-member team to engage in collaborative design using optimal tools. • An automated process used 3D roadway design models to detail over 1,000 geometric and staking callouts. The firm’s Bentley SELECT® subscription benefited the geographically dispersed team by giving members easy access to Bentley’s product portfolio. Flexible licensing and Bentley LEARN® training helped with workload balancing. Bentley software streamlined design and automated repetitive tasks, facilitating a Lean Project Delivery approach that enabled Foth to meet the aggressive deadline. Typically, a project of this magnitude would take a design team of that size more than 16 weeks to finish. Foth’s team completed the design and sent the project to bid in just six weeks. Interoperability Produces Master Model GEOPAK Civil Engineering Suite offered a flexible suite of integrated tools for surveying and design of roads, sites, drainage networks, and storm and sanitary sewer systems. Foth maximized the benefits of Bentley product interoperability by using GEOPAK in conjunction with other civil software to take on the challenging scope of work. In addition to multiple multi-lane roundabouts, the corridor featured a two-lane bridge, box-culvert underpass, recreational trail, and stream realignment. GEOPAK site design tools were used to model the roundabouts, bridge berms, and stream realignment. GEOPAK’s Corridor Modeler was used to model the roadway in between roundabouts, which involved the design of pavement widening and full reconstruction, as well as recreational trails. Foth used GEOPAK’s data acquisition tools to import the models and create a 3D master model of the entire project. The master model was ultimately used to cut cross sections and serve as a reference during plan preparation. In areas where the storm sewer network had to be retrofitted, GEOPAK drainage tools allowed the designers to lay out the existing network, then place additional nodes and pipes relative to the new alignment. This drainage model was exported into StormCAD® for advanced network modeling, and then imported back into GEOPAK for final plan preparation. Flood Protection, Pedestrian Safety Priorities Foth used FlowMaster® and CulvertMaster® to perform the extensive hydraulic analyses required for correction of

 Open the catalog to page 1

All Bentley Systems Europe B.V. catalogs and technical brochures

  1. ConstructSim

    2  Pages

  2. promis•e

    2  Pages

  3. STAAD.Pro

    2  Pages

Archived catalogs

  1. Water modelling

    24  Pages

  2. RAM CADStudio

    2  Pages

  3. Bentley MAP

    2  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.