Fitzpatrick Engineering Group Uses BIM to Shorten Construction Time for Steel Buildings
2Pages

{{requestButtons}}

Catalog excerpts

Fitzpatrick Engineering Group Uses BIM to Shorten Construction Time for Steel Buildings - 1

CASE STUDY Project Summary Organization: Fitzpatrick Engineering Group Location: North Carolina, United States Project Objective: • Optimize the product delivery schedule • Implement a faster, more efficient way to deliver structural steel Products used: AECOsim Building Designer, RAM Structural System, MicroStation PowerDraft Fast Facts • The tight integration and interoperability among RAM Structural System, AECOsim Building Designer, and third-party software allowed Fitzpatrick Engineering to develop a sustainable process. • Staying in 3D as long as possible and sending incremental updates to the detailer enabled a faster, more efficient process. ROI • Shortened construction schedule by eight weeks • Eliminated RFIs and change orders • Helped Octapharma save USD 2 million Fitzpatrick Engineering Group Uses BIM to Shorten Construction Time for Steel Buildings Sharing Model Data with Detailer Helps Deliver Steel Faster and More Efficiently, Saving Octapharma USD 2 Million When Octapharma determined that centralizing its storage and lab processing would save the company USD 1 million per month, accelerating the construction schedule of its new North Carolina facility was paramount. Fitzpatrick Engineering Group was able to compress the construction schedule by eight weeks, by sharing accurate structural model data early and often with the detailer in the design phase. Using Bentley software, Fitzpatrick Engineering implemented a better, more efficient way to deliver structural steel, reduce RFIs and change orders, and help Octapharma save USD 2 million. Shortening the Schedule Without Sacrificing Efficiency With USD 1 million per month on the line, meeting the tight schedule was crucial on this project. Technology and BIM have helped facilitate faster projects, but faster doesn’t always mean more efficient. Doug Fitzpatrick, president of Fitzpatrick Engineering Group explains: “Even though we work in BIM now, in 3D, most of our projects require delivery of 2D construction documents. The construction team, and ultimately the fabricator’s detailer, must then recreate its own 3D data from our 2D documents and do so in a fraction of the time that we had to create the 3D models in the first place. It is an outdated linear process still overly reliant on 2D drawings and a costly waste of effort on every project.” “Sometimes there is a one-time electronic hand-off of structural information; a noticeable improvement, however, any information after that has to be recreated manually from 2D drawings.” This meant that the earlier the detailing started the less design information there was to transfer electronically, and the more data the detailer had to recreate by hand. Sharing 3D Data is Crucial Fitzpatrick Engineering Group used RAM Structural System for structural analysis and design, AECOsim Building Designer for modeling, and MicroStation PowerDraft for drafting. Bentley software’s interoperability made it easy for Fitzpatrick Engineering Group to collaborate. For this particular project the architect, mechanical, electrical, and plumbing firms all worked in Revit; the contractor worked in Navisworks; and the freezer specialist worked in AutoCAD. “We shared our AECOsim model as a Revit model for the design and construction teams via the Integrated Structural Modeler (ISM),” explained Fitzpatrick. “The ISM allowed us to easily update models for the team members on a weekly basis yet still leverage all the AECOsim features and functionalities that make our new process more efficient.” Fitzpatrick Engineering Group realized that keeping the steel detailer’s data in 3D as long as possible was essential. With AECOsim Building Designer’s enhanced CIS/2 export, New construction delivery Fitzpatrick Engineering Group processes (such as could share accurate model design-build, integrated data repeatedly with the project delivery, and fast detailer during the design tracking) seek to speed the AECOsim Building Designer creates a complete detailer model, ready for delivery of fabrication data to the phase. This ensured the process, but haven’t steel supplier. detailer had the most accurate necessarily addressed the and up-to-date information and efficiency problem. “The virtually eliminated the need for the detailer to recreate data traditional detailing process has simply been pushed earlier from 2D documents. Fitzpatrick Engineering Group and the into the structural design phase,” explained Fitzpatrick.

Open the catalog to page 1
Fitzpatrick Engineering Group Uses BIM to Shorten Construction Time for Steel Buildings - 2

“Working in RAM Structural System and AECOsim Building Designer to share our model data has allowed our small firm to provide a USD 2 million savings for this project by compressing the delivery time of the structural steel package.” detailer also worked to ensure the steel fabricator’s preferences were incorporated into the model. A Faster, More Efficient Process “The ability to share model data multiple times during the design phases of the project was the key component to meeting the demanding schedule,” noted Fitzpatrick. “The process allowed us to reduce the traditional 12- to 14-week...

Open the catalog to page 2

All Bentley Systems Europe B.V. catalogs and technical brochures

  1. ConstructSim

    2 Pages

  2. promis•e

    2 Pages

  3. STAAD.Pro

    2 Pages

Archived catalogs

  1. Bentley MAP

    2 Pages