CASE STUDY Project Summary Organization Copenhagen Airport A/S Solution Buildings and Campuses Location Copenhagen, Kastrup, Denmark Project Objectives • Produce information-rich 3D models from 2D drawings, surveys, and field inspections. • Create BIM standards to save at least 4 percent of the entire project's budget. Products Used ContextCapture, Descartes, Pointools, Bentley Map', MicroStation', ProjectWise' Copenhagen Airport A/S Created BIM Process Standards for Existing Building Projects Bentley's 3D Modeling Applications Helped Achieve a 4.46 Percent Cost Savings Fast Facts • Copenhagen Airport looked at existing LOD definitions to create their models. • MicroStation joined IFC and DGN files and helped handle large point clouds of data. • ProjectWise housed all project information, including the 2D data. The organization realized a 4.46 percent cost savings, surpassing its 4 percent goal. To execute the project faster, the team joined IFC and DGN files, as all the original 2D drawings were in DGN format. Compiling all data into a central repository in ProjectWise saved significant time. A Milestone Event Venue The Copenhagen Airport A/S wanted to implement building information modeling (BIM) processes on its upcoming projects to prove that utilizing BIM methodologies would be a beneficial investment. Most of the airports projects are the operation, maintenance, and refurbishment of existing buildings, but the airport still wanted to see the benefits of BIM workflows. The DKK 10 million initiative included producing information-rich 3D models of the facilities based on a combination of 2D drawings, surveys, and field inspections. The project also called for creating BIM process standards, including specification of a level of detail (LOD) for new building projects. Implementing a BIM Process The project team wanted to prove that using BIM processes throughout the project would benefit the building owner by saving cost. According to a 2012 report from the Danish Technical University, building owners who implemented a BIM process achieved a cost savings of approximately 12 percent. To prove that they could also achieve savings, team members set a goal to save at least 4 percent of the entire projects budget, as their BIM processes would not be as mature as others in the study. The main challenge for the Copenhagen Airport project team was that BIM processes in Denmark were not well established. To overcome this challenge, the organization collaborated with different companies to hear other views on the best way to implement BIM methodologies. By speaking with these different organizations, the project team produced a standard for future BIM process creation that would help them and other Danish organizations prepare for and benefit from BIM adoption. Setting Standards To create an effective model, Copenhagen Airport looked at existing LOD definitions to create their models, making sure to include the right amount of information to benefit both operators and consultants. Many of the existing definitions lacked the idea that much of the information can be obtained with data on less detailed objects. The project team decided to include graphical and non-graphical information in the definitions, with more non-graphical information than seen in other standards. The team created a 3D model that included the important information from the 2D drawings, which they used as a baseline. Engineers also visited the sites and added any 2D information that was missed or incorrect. The team adopted their new BIM processes on this model, including the parameters on all surveyed objects. Additionally, all project participants were taught how to accurately use the model to gather information. Existing LOD definitions were used to create the models. Saving Time and Improving Collaboration By using Bentley applications to help create a 3D model and an innovative BIM process, Copenhagen Airports project team saw significant time savings. The team quickly extracted heights with MicroStation's ability to handle large point clouds, even when the surveyor was not present on the construction site. Users also joined IFC and DGN files, which helped execute the project faster because the original 2D drawings were in DGN format. There was also greater quality control over the information because the 2D data was included in the 3D models.
Open the catalog to page 1"We started with ContextCapture to help establish knowledge in more complex areas, where creating a BIM model would be too expensive. ContextCapture could be used to quickly create a pointcloud without laser scanning knowledge. Bentley Map was used to view spatial data, which Copenhagen Airport stores in an Oracle database." - Michael Friis 0rsted, Head of Department, Technical Knowledge, Copenhagen Airport A/S The team used ProjectWise to house all relevant information, including the 2D data, which helped users easily find information. Previously, team members would have spent unnecessary...
Open the catalog to page 2All Bentley Systems Europe B.V. catalogs and technical brochures
-
Digital Airport Project Showcase
18 Pages
-
Water_Hazelwood_Coal_Mine
2 Pages
-
Water_Simtejo_case_study
2 Pages
-
Wimbledon Stadium_Case Study
2 Pages
-
WSP-Shard_Case_Study
3 Pages
-
Bentley’s Water Project Showcase
92 Pages
-
Mine Water Software Solution
4 Pages
-
AutoPLANT Equipment V8i
2 Pages
-
AutoPLANT Piping V8i
2 Pages
-
ConstructSim
2 Pages
-
promis•e
2 Pages
-
Bentley Datasheets
2 Pages
-
Making PDS Interoperable
17 Pages
-
Bentley OpenPlant PowerPID
2 Pages
-
STAAD.Pro
2 Pages
Archived catalogs
-
Water modelling
24 Pages
-
Bentley Water V8 XM
2 Pages
-
Bentley Cadastre Specsheet
2 Pages
-
STAAD Foundation
2 Pages
-
RAM CADStudio
2 Pages
-
Bentley MAP
2 Pages
-
Bentley Structural Brochure
2 Pages
-
Bentley Project Yearbook 2006
82 Pages
-
Bentley SewerCAD
2 Pages
-
Bentley WaterCAD
2 Pages
-
Bentley WaterGEMS
2 Pages
-
Bentley HAMMER
2 Pages
-
Bentley StormCAD
2 Pages
-
Bentley SewerGEMS
2 Pages
-
Bentley AutoPlant P&ID
2 Pages
-
Bentley Microstation
2 Pages
-
Bentley Architecture
2 Pages
-
Bentley ProjectWise brochure
2 Pages
-
Bentley CivilStorm
2 Pages
-
Bentley ProjectWise
4 Pages
-
Bentley PowerDraft
2 Pages
-
Bentley AutoPipe Specsheet
2 Pages