1. Catalogs
  2. BAUER Maschinen GmbH
  3. TBA 200 Deep Drilling Unit

TBA 200 Deep Drilling Unit

TBA 200 Deep Drilling Unit

TBA 200 Deep Drilling Unit

Product catalog summary
Overview: The TBA 200 Deep Drilling Unit is engineered for efficiency, safety, quality, reliability, and environmental protection. It is suitable for geothermal, oil, and gas drilling up to 3000 meters, depending on well design. Key features include a small footprint, reduced crew requirements, and optimized transport and power needs.
Specifications: The TBA 200 features a telescopic mast with a retracted height of 23 meters and an extended height of 33 meters. The hybrid draw works system provides a pull of 200 tons with a stroke of 16.24 meters. The top drive is hydraulically driven, offering a maximum torque of 35,000 Nm and a rotation speed of 150 rpm.
Draw Works and Crowd System: The BAUER Hybrid draw works system facilitates fast and powerful installation and extraction of drill pipes, collars, and casings. It includes an automatic load control system, anti-collision system, and fine adjustment of pulling force.
Hydraulic Top Drive: The TDK 35 top drive is powered by two hydraulic motors, providing a maximum torque of 35 kNm. It includes automatic elevator links and an optional clamping head.
Driller's Control Cabin: The control cabin offers an ergonomic environment with joystick control and a data acquisition system for monitoring various drilling parameters.
Transport Weights and Dimensions: The base unit requires one heavy transport, with all other components being container-sized. The total transport weight is 190 tons, with dimensions of 21.0 m in length, 3.4 m in width, and 3.0 m in height.
Mud Handling System: The MAT TSA 4000 system is compact and modular, handling a flow volume of 250 m³/h with a tank storage capacity of 110 m³. It includes various components such as agitator tanks, shale shaker, and mud pumps.
Mud Pumps: Two triplex mud pumps provide high-pressure drilling service, each with an input power of 900 kW and a nominal pressure of 350 bar. They are equipped with frequency control, pulsation dampeners, and safety valves.
Footprint: The TBA 200 occupies a footprint of 28 m x 30 m, including components like the V-Door pipe handling, power pack, and mud pumps.
See more

Catalog excerpts

TBA 200 Deep Drilling Unit-1

905-661-X_02-10_TBA200.qxd 10.02.2010 15:19 Uhr Seite 1 TBA 200 Deep Drilling Unit 2/2010

 Open the catalog to page 1
TBA 200 Deep Drilling Unit-2

905-661-X_02-10_TBA200.qxd 10.02.2010 15:22 Uhr The Deep Drilling Unit TBA 200 is designed and manufactured on the key principles • Efficiency • Safety • Quality • Reliability • Environmental protection The TBA 200 is the result of 40 years of experience in manufacturing hydraulic foundation rigs, combined with innovative new ideas to meet the requirements of the deep drilling industry. It is particularly suited for geothermal drilling as well as for oil and gas drilling down to 3000 m.* * (depending on well design) • Small footprint • Reduced drill crew • Easy and fast set-up operation • Optimized...

 Open the catalog to page 2
TBA 200 Deep Drilling Unit-3

905-661-X_02-10_TBA200.qxd 10.02.2010 15:23 Uhr Seite 3 SPECIFICATIONS TBA 200 Telescopic mast Base mast . . . . . . . . . . . . . . . . . . . . . . . . . . . . . U-type with universal beams Inner mast . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . box type Mast height retracted . . . . . . . . . . . . . . 23 m . . . . . . . . . . . . . . . . . . . . . 75 ft extended . . . . . . . . . . . . . . 33 m . . . . . . . . . . . . . . . . . . . . 108 ft Draw works Hybrid draw works Winch (casing installation) Pull (8 lines) . . . . . . . . . . . . . . . . ....

 Open the catalog to page 3
TBA 200 Deep Drilling Unit-4

Various components are ensuring safety, speed and reliability of the draw works operations: - Automatic load control system -Anti-collision system - Measurement of force and speed - Fine adjustment of pulling force The hydraulically operated top drive is based on 40 years of experience in building rotary heads for drilling rigs. It is designed to meet advanced performance standards in terms of torque, rotation speed and reduced hydraulic motors to create a max. pipes and casing is assisted by automatic elevator links 3 1/2" to 20" A clamping head is available as an option instead of elevators....

 Open the catalog to page 4
TBA 200 Deep Drilling Unit-5

CONTROL CABIN The Driller's control cabin offers a high quality workplace with ergonomie working environment with joystick control. The in-built data acquisition system offers a variety of control, recording relevant informations such as (but - Drillometer hook load rotation speed and torque of top - Torque of screwing unit - Pressure of flushing system and differential flush pressure - Pipe handling control - Indication of progress data such as drilling depth, drilling speed, crowd speed of top drive, flush pump performance, digital recording of drill pipes - Rig supervision data (oil pressure,...

 Open the catalog to page 5
TBA 200 Deep Drilling Unit-6

905-661-X_02-10_TBA200.qxd 10.02.2010 15:31 Uhr Seite 6 RIG UP STEPS 1 Arrive on low bed trailer 2 Maneuver TBA to positioned mast foot 3 Remove low bed trailer 4 Lift TBA with cylinders 5 Lock TBA with mast foot and set up power pack 6 Raise mast with backstay cylinders 7 Extend inner mast with cylinder 8 Connect drill floor with mast foot 9 Raise drill floor to level + 4.6 m 1 2 6 7 3 4 8 5 9

 Open the catalog to page 6
TBA 200 Deep Drilling Unit-7

4000 is a very compact, modular package for deep drilling operations. daughter company of BAUER Maschinen. The recycling unit can handle a flow volume of 250 m3/h. The tank plant storage Flow line primer TS 500 Shale shaker with cyclone BE 250 Mixer (Venturi nozzle) Displacement pump 12 bar 400 l/min Triplex mud pumps are engineered for high pressure drilling service. Two units are feeding the operation. For easy transport and erection each pump is mounted in a standard 20 ft container with a transport width Max. delivery rate: . . 2 x 2,400 l/min electrically operated. They are equipped with...

 Open the catalog to page 7
TBA 200 Deep Drilling Unit-8

905-661-X_02-10_TBA200.qxd 10.02.2010 15:35 Uhr Seite 8 2 9 10 1 6 3 7 8 5 4 FOOTPRINT 28 m x 30 m 1 TBA 200 6 Storage drill pipe / casing 2 V-Door pipe handling 7 TSA 4000 3 Ex-Zone 7.5 m 8 Mud pumps 4 Power pack 9 Centrifugal pumps 5 VFD-Container 10 Flow line primer BAUER Maschinen GmbH BAUER-Straße 1 D-86529 Schrobenhausen Tel. + 49 (0)82 52/97-0 Fax + 49 (0)82 52/97-11 35 e-mail: [email protected] www.bauer.de Design developments and process improvements may require the specification and materials to be updated and changed without prior notice or liability. Illustrations may include optional...

 Open the catalog to page 8
*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.