Repair Parts List A91079 Mini Tie-Lok II Tool See list of tool head parts on reverse side 1 Bearing, thrust (3 pieces) 1 Decal, tension indicator 1 Body, left, black 1 Lever, pull-up, front load 1 Body, right, black Adhesive, cyanoacrylate Grease, extreme pressure Red Loctite (high strength) Blue Loctite (med. strength) cut-off link and pin shown as a reference from reverse side
Open the catalog to page 1Repair Parts List A91079 Mini Tie-Lok II Tool Partial view of pull-up lever and spring shown previous page Link, cut-off Lever, cut-off Dimple punch Clip, left Tool head Blade, Mini Tie-Lok II Clip, right Gripper, hold Grease, extreme pressure Blue Loctite (med. strength)
Open the catalog to page 2RB/iin #F~ Operating Instructions THE CLAMPING EXPERTS A91079 Mini Tie-Lok II Tool Always wear safety glasses when operating hand tool. 1. Turn tension adjustment knob until desired tension setting is displayed in tension indicator window. Space between numbers counts as one-half setting. See step 6. 2. Extend handle open to release gripping mechanism and insert clamp tail into tool through front load entry. 3. Squeeze handle repeatedly to tighten band around object. Be sure to release handle completely to use full pull-up stroke of tool. Buckle must be secure against the tool head and nestled...
Open the catalog to page 32 Pages
2 Pages
1 Page
4 Pages
48 Pages
2 Pages
2 Pages
4 Pages
1 Page
1 Page
2 Pages
2 Pages
2 Pages
2 Pages
2 Pages
1 Page
1 Page
4 Pages
1 Page
2 Pages
1 Page
2 Pages
10 Pages
8 Pages
19 Pages
46 Pages