
AL748 - NEW MAIN AIR CONTROL VALVE AL752 - MAIN AIR CONTROL VALVE FULL ASSEMBLY (ALL PICTURED)
Open the catalog to page 1INSTALLING NEW MAIN AIR CONTROL VALVE INSTRUCTIONS Instructions below or scan QR Code for video on how to install new MACV STEP 1 – REMOVE OLD CONTROL VALVE AND ALL FITTING FROM CONTROL VALVE MOUNT STEP 2 – INSERT 2x MACV BOLT INTO TOP TWO HOLES ON CONTROL VALVE MOUNT STEP 3 – PLUG IN 8mm TUBING AS NORMAL AND SECURE NEW MAIN AIR CONTROL VALVE TO RIGHT HAND MACV BOLT TIGHTLY WITH AL754 M4 NUT. THEN SCREW ON 2x REMAINING AL754 NUTS TO HEIGHTS SHOWN. STEP 4 – PLACE AL773 NEW AIR VALVE COVER IN PLACE AND SECURE WITH 2x AL124 WASHER & 2x AL753 DOME
Open the catalog to page 2NEW MAIN AIR CONTROL VALVE KIT AL748 - MAIN AIR CONTROL VALVE ONLY (AL752 - FULL ASSEMBLY)
Open the catalog to page 336 Pages
20 Pages
12 Pages