ASCENTIAL TECHNOLOGIES GLOBAL SUPPLY CHAIN REQUIREMENTS SECTION CONTENT PAGE As part of an increasingly competitive and demanding marketplace, Ascential Technologies has a diversified, global supply chain that supports our global operations and, ultimately, our OEM Customers. Ascential Technologies has implemented many changes over the past few years, and we continue to evolve, in our efforts to maintain our position as a world-class design, engineering and manufacturing company. We recognize that our supply chain is an integral part of what we do, and we have committed to continue our efforts...
Open the catalog to page 2The expectations, requirements and standards defined within this manual are applicable to all Suppliers providing materials, products and services to any Ascential Technologies manufacturing facility. This includes Suppliers of direct materials and, as appropriate, indirect materials, packaging materials and services (including containment, sorting and calibration services) with potential impact on any product characteristics affecting Ascential Technologies' Customer requirements. These requirements also apply, in whole, to any supplier that is directed to Ascential Technologies, by any Original...
Open the catalog to page 3notification or insufficient lead time, from the supplier, will be the responsibility of the supplier and will be charged to the supplier, as appropriate. Continued non-compliance may lead to loss of business. Suppliers are required to have well defined business contingency plans in place to ensure continuity of supply in the event of disruption to their operations and/or supply of materials, as a result of manmade events, natural disasters, utility or labor disruptions, equipment or logistics failures or interruptions, or disruptions/attacks on information technology systems. These contingency...
Open the catalog to page 4Currently, SEC requirements list Tin, Tantalum, Tungsten and Gold (collectively, 3TG) as Conflict Minerals. Other minerals may be added in the future. Other jurisdictions, including the EU, are in the process of implementing or considering similar Conflict Minerals regulations. To ensure compliance with the SEC requirements, and any requirements implemented by other jurisdictions in the future, Ascential Technologies must request information regarding the use of conflict minerals, from any appropriate Suppliers. Any Suppliers contacted by Ascential Technologies, are required to support Ascential...
Open the catalog to page 5Ascential Technologies’ goal is f or all Suppliers of materials and services, producing or af f ecting direct production material at our Test & Measurement Division, to become certif ied to IATF 16949. At minimum, all Suppliers of direct production material to Ascential Technologies, must demonstrate conf ormity to the latest IATF 16949 Standard, and/or to other standards that might be directed by the procuring Division(s) / sites including, but not limited to VDA, ISO 17025, ISO 45001, ISO/IEC 27001, TISAX/TPISR, ISO 26262 and ISO 15504-5 Automotive SPICE, latest revision of IPC-A-610, latest...
Open the catalog to page 63. OPERATION - DESIGN & DEVELOPMENT PLANNING 3.1 DEFINING THE SCOPE Ascential Technologies requires Suppliers to complete all advance product planning and submission in full accordance with the AIAG Advance Product Quality Planning and Control Plan manual. Unless otherwise directed and approved by your procuring Ascential Technologies Division(s), all PPAP submissions shall be as per Level 3 requirements, at minimum. As determined by Ascential Technologies' customer and upon request by Ascential Technologies, Suppliers must additionally meet submission requirements as per the current version...
Open the catalog to page 7Suppliers with design responsibility must complete all appropriate Design Failure Modes Ef f ects Analysis (DFMEA), in compliance with latest AIAG standards and have them available f or review and Suppliers with design responsibility must receive Ascential Technologies approval of all product design, test and validation specif ications, including CAD specif ications and transf er requirements. Suppliers with design responsibility shall ensure all personnel with design responsibility are competent in all applicable tools and techniques, as identif ied by the Supplier. All deviations must be approved...
Open the catalog to page 8All product characteristics, as identif ied by Ascential Technologies or its OE Customer, af f ecting design, manuf acture, assembly, f t or f unction (including f uture/subsequent processing), will be identif ied and communicated by the procuring Ascential Technologies Division. As part of the ultimate product and process validation, Suppliers shall be required to establish, validate and maintain short and long term capability, as def ined by Ascential Technologies. Customer designated special characteristics, as identif ied by Ascential Technologies or its OE Customer, af f ecting saf ety or...
Open the catalog to page 9governmental or Customer specific requirements, pursuant to requirements communicated in writing by the procuring Ascential Technologies Division(s). Records must be stored in a location and/or environment that protects against inadvertent destruction. Manufacturing process control must include continuous monitoring of product/process characteristics and of all key parameters influencing the manufacturing process. Appropriate statistical process control methods, or error- proofing, must be applied on all characteristics identified through the APQP process and as directed by your procuring Ascential...
Open the catalog to page 10- Group SQA/D Leads (S) - Regional SQA/D Leads (S) - Global Commodity Directors (I) - Ascential Technologies Risk Management (I) - Group SQA/D Leads (S) - Regional SQA/D Leads (I) - Global Commodity Directors (I) SUPPLIER TOP FOCUS AND ESCALATION PROCESS - 6 Month rating remains <80% over a period of 6+ months - Recurring pass-thu Customer issues - 6 Month rating falls below 80% - Critical commodity/component - Number of Priority 1/2 complaints - Unresolved & recurring issues - Risk assessment - Standard Dvision SCM Process - as defined by Quality Management System Procedures The Ascential Technologies...