Catalog excerpts
GUIDED BORING METHOD WITH POWERED REAMING HEAD Step 1: PRECISE INSTALLATION OF PILOT TUBES The first step is the installation of the pilot tube on line and grade. Step 2: ADVANCING THRUST CASINGS ALONG PILOT TUBE PATH The second step is to follow the pilot tube with a reaming head or other upsizing tool and standard 11” OD thrust casings. Step 3: INSTALLATION OF PRODUCT PIPE WITH POWERED REAMING HEAD In the third step, the powered reaming head follows the thrust casings to increase the bore to match the product pipe diameter. Lubrication Ports (3) On Rear Section Jetting Ports (2) On...
Open the catalog to page 2All Akkerman catalogs and technical brochures
-
GBM 48 Series Jacking Frame
4 Pages
-
P100 Power Pack
2 Pages
-
P150 Power Pack
2 Pages
-
P250D Power Pack
2 Pages
-
P275 Power Pack
2 Pages
-
GBM Guidance System
2 Pages
-
Notched Thrust Casings
2 Pages
-
TBM Series II
2 Pages
-
5000 Series Pump Unit
2 Pages
-
EH2550 Bentonite Pump
2 Pages
-
5000 Series II Pump Unit
2 Pages
-
P400/P600 Power Pack
2 Pages
-
EH2250 Bentonite Pump
2 Pages
-
Akkerman Product Guide
15 Pages
-
1548 Haul Unit
2 Pages
-
524 Haul Unit
2 Pages
-
TBM
2 Pages
-
Control Container
2 Pages
-
Eliminator
2 Pages
-
PCH 36-44"
2 Pages
-
PCH 20-28.5"
2 Pages
-
Jetting and Lubrication Pump
2 Pages
-
P275T Power Pack
2 Pages
-
P150Q Power Pack
2 Pages
-
P100Q Power Pack
2 Pages
-
4812A Jacking Frame
2 Pages
-
308A/339A Jacking Frame
2 Pages
-
240A Jacking Frame
2 Pages
-
EPBM Systems Product Guide
1 Pages
-
Akkerman Product Guide
15 Pages
-
5000 Series Jacking System
1 Pages
-
Tunnel Boring Machine (TBM)
1 Pages
-
Microtunneling
1 Pages
-
Guided Boring Machines (GBM)
52 Pages