PCH 36-44"
1 /2Pages

PCH 36-44"

PCH 36-44"
1 /2Pages

Catalog excerpts

PCH 36-44"-2

GUIDED BORING METHOD WITH POWERED CUTTER HEAD Step 1: PRECISE INSTALLATION OF PILOT TUBES The first step is the installation of the pilot tube on line and grade. Step 2: ADVANCING THRUST CASINGS ALONG PILOT TUBE PATH The second step is to follow the pilot tube with a reaming head, or other upsizing tool and standard thrust casings. Step 3: INSTALLATION OF PRODUCT PIPE WITH POWERED CUTTER HEAD In the third step, the powered cutter head follows the thrust casings to increase the bore to match the product pipe diameter. 47 GBM_PCH36-44, FA44100F-FA43400F

 Open the catalog to page 2

All Akkerman catalogs and technical brochures

  1. TBM Series II

    2  Pages

  2. 524 Haul Unit

    2  Pages

  3. TBM

    2  Pages

  4. Eliminator

    2  Pages

  5. PCH 20-28.5"

    2  Pages

  6. PRH Kit

    2  Pages

*Prices are pre-tax. They exclude delivery charges and customs duties and do not include additional charges for installation or activation options. Prices are indicative only and may vary by country, with changes to the cost of raw materials and exchange rates.