LSXPT Joint Honeycomb Optical Table POT Lab Experiment
1 / 3ページ

{{requestButtons}}

カタログの抜粋

LSXPT Joint Honeycomb Optical Table POT Lab Experiment - 3

Installation 1.After opening the packing to get the supports, placed the support which with data tag on the left of breadboard along it’s length side. Using the matched bolt to Link the connection rods with support.The bolt should be screwed in completely, but no need to tighten which will easy for following adjustment. 2.Placing the pre-linking supports in rectangle (you would better measure the diagonal to keep the same length),then the bolt can be tighten, make the vibration isolation supports into an rigid integral. 3.Adjust the support bottoms to keep height consistent and keep 1 cm...

カタログの3ページ目を開く

Jiangxi Liansheng Technology Co.のすべてのカタログと技術パンフレット

  1. Optical Mirror Mount

    23 ページ

  2. Magnetic Base

    2 ページ

  3. Manual Tilt Stage

    2 ページ

  4. Optical Table

    23 ページ

カタログアーカイブ