| Tel: _ Fax: _ Internet:_ e-mail: _ 1. No. of conductor systems:_ 2. Type of crane/machinery to be electrified:_ 3. Voltage:_Volts, ~/= □ Phases:_ c/s:_ (Three phase current) 4. Length of conductor systems:_ 5. Number of conductors:_ (power lines:_ control lines:_ neutral (ground):_) 6. Arrangement of conductors: □ Conductor rails suspending / Collectors standing □ Conductor rails resp. current collectors lateral □ Others:_ 7. Number of cranes or machines electrified from the one system:_ 8. Indoor: □ Outdoor: □ 9. Special site conditions (humidity, dust, chemical effects etc.): 10. Temperature conditions:_°C min._°C max. 11. Expansion gaps of building:_pieces in max distance:_mm 12. Number and position of feeder points:_ 13. Number and position of isolating sections (e.g. for maintenance areas):_ 14. Mounting position envisaged:_ (prints and sketches should be submitted whenever obtainable) 15. Travelling speed of machinery:_ 16. Ampere load of each crane/machine:_ (Use table on page 50). 17. Max. voltage drop from feeder point to current collectors 3% □ or_ % □ of voltage rating Other important data:_ |