Insulated conductor system U20, U30, U40 - VAHLE - #48

/ 52


catalogue search
P. 01
P. 02
P. 03
P. 04
P. 05
P. 06
P. 07
P. 08
P. 09
P. 10
P. 11
P. 12
P. 13
P. 14
P. 15
P. 16
P. 17
P. 18
P. 19
P. 20
P. 21
P. 22
P. 23
P. 24
P. 25
P. 26
P. 27
P. 28
P. 29
P. 30
P. 31
P. 32
P. 33
P. 34
P. 35
P. 36
P. 37
P. 38
P. 39
P. 40
P. 41
P. 42
P. 43
P. 44
P. 45
P. 46
P. 47
P. 48
P. 49
P. 50


See other catalogues for VAHLE
You may also be interested in

Antenna, Cable trolley, Tensioner, Rubber tired gantry, Busbar


Text version of the page
Untitled
_L\ QUESTIONNAIRE
Fa.
Date:
Tel:
Fax: E-mail:
Internet:
1. No. of conductor Systems:
2. Type of crane/machinery to be electrified:
3. Voltage:.
Volts, ~/= □
Phases:
c/s:
(Three phase current)
4. Length of conductor systems:.
5. Number of conductors: _
(power lines:
control lines:
neutral (ground):_
)
6. Arrangement of conductors:
□ Conductor rails suspending / Collectors standing
□ Conductor rails resp. current collectors lateral
□ Others:_
7. Number of cranes or machines electrified from the one system: _
8. Indoor: □ Outdoor: □
9. Special site conditions (humidity, dust, chemical effects etc.):
10. Temperature conditions: -
. °C min. .
. °C max.
11. Expansion gaps of building: .
. pieces in max distance: .
mm
12. Number and position of feeder points:.
13. Number and position of isolating sections (e.g. for maintenance areas):.
14. Mounting position envisaged:_
(prints and sketches should be submitted whenever obtainable)
15. Travelling speed of machinery:.
16. Ampere load of each crane/machine:.
(Use table on page 50).
17. Max. voltage drop from feeder point to current collectors Other important data: _
3% □
or
% of voltage rating
Please submit prints or sketches for curved tracks, discontinuous.
44

pageCatalog pdf di En 2012-02-07-17