1. No. of conductor Systems:
|
|
|
|
|
|
|
|
2. Type of crane/machinery to be electrified:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(Three phase current)
4. Length of conductor systems:.
|
|
|
|
|
|
|
|
5. Number of conductors: _
|
|
|
|
|
|
|
|
|
|
|
|
6. Arrangement of conductors:
□ Conductor rails suspending / Collectors standing
□ Conductor rails resp. current collectors lateral
□ Others:_
|
|
|
|
|
|
|
|
7. Number of cranes or machines electrified from the one system: _
8. Indoor: □ Outdoor: □
9. Special site conditions (humidity, dust, chemical effects etc.):
|
|
|
|
|
|
|
|
10. Temperature conditions: -
|
|
|
|
|
|
|
|
|
|
11. Expansion gaps of building: .
|
. pieces in max distance: .
|
|
|
|
|
|
|
|
|
12. Number and position of feeder points:.
|
|
|
|
|
|
|
|
13. Number and position of isolating sections (e.g. for maintenance areas):.
14. Mounting position envisaged:_
|
|
|
|
|
|
|
|
(prints and sketches should be submitted whenever obtainable)
|
|
|
|
|
|
|
|
15. Travelling speed of machinery:.
|
|
|
|
|
|
|
|
16. Ampere load of each crane/machine:.
(Use table on page 50).
|
|
|
|
|
|
|
|
17. Max. voltage drop from feeder point to current collectors Other important data: _
|
|
|
|
|
|
|
|
|
|
|
Please submit prints or sketches for curved tracks, discontinuous.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|