| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | |
| | | expansion joint sections* /x | | |
| | | |
| | | | | | | | | | | | | | | | | | LSV | LSVG 1 | | | | TyPe Cat.-No. | Type Cat.-No. | Type Cat.-No. | Type Cat.-No. | Type Cat.-No. | | | | Power line HS with PE | Power line HS with PE | Power line HS with PE | Power line HS with PE | Power line HS with PE | | | | DSL 4/ 60 | 194 020 | DSL 6/ 60 | 194 120 | DSLG 6/ 60 | 183 560 | DSLG 8/ 60 | 183 660 | DSLG 11/ 60 | 183 750 | | | | DSL 4/100 | 195 108 | DSL 6/100 | 195 112 | DSLG 6/100 | 184 017 | DSLG 8/100 | 184 021 | DSLG 11/100 | 184 024 | | | | DSL 4/140 | 195 056 | DSL 6/140 | 195 058 | DSLG 6/140 | 183 943 | DSLG 8/140 | 183 945 | DSLG 11/140 | 183 948 | | | | DSL 4/200 | 195 109 | DSL 6/200 | 195 626 | DSLG 6/200 DSLG 6/300 | 184 018 183 600 | DSLG 8/200 | 184 652 | DSLG 11/200 | 184 655 | | | | DSL 4/300 | 194 060 | DSL 7/ 60 | 194 150 | DSLG 9/ 60 DSLG 9/100 DSLG 9/140 | 183 690 184 022 183 946 | Control line SS without PE | | | | DSL 5/ 60 | 194 070 | DSL 7/100 DSL 7/140 | 195 113 195 059 | DSLG 7/ 60 | 183 610 | DSLG 6/ 60 | 183 780 | | | | DSL 5/100 DSL 5/140 DSL 5/200 DSL 5/300 | 195 110 195 057 195 111 194 110 | DSL 7/200 | 195 627 | DSLG 7/100 DSLG 7/140 | 184 019 183 944 | DSLG 9/200 | 184 653 | DSLG 8/ 60 DSLG 10/ 60 | 183 790 183 800 | | | | Control line SS without PE | DSLG 7/200 | 184 020 | DSLG 10/ 60 DSLG 10/100 | 183 720 184 023 | | | | DSL 4/ 60 | 194 180 | DSLG 7/300 | 183 650 | VwkM 1 \J1 1 \J\J DSLG 10/140 | 183 947 | | | | | | DSL 6/ 60 | 194 190 | | | DSLG 10/200 | 184 654 | | | | | | | | | | | | | | | | | | | |
| | | |
| | | Expansion joints are only required for LSV and LSVG systems using bolted joints. They serve to compensate for the different expansion and contraction of the aluminium housing and the copper conductors in varying temperatures. (Plug-in type connectors manufacturer, sliding inside the hollow conductors do automatically take care of this - with the copper conductors being anchored in each standard Powerail section). Expansion joints are required if the Powerail length between two anchor points (feeds, sectionalizings and transfer guides are such anchor points and factory assembled extra anchor points FPL/Cu and FPLG/Cu are available) exceeds L/6 per Fig. 1 and 2. Corresponding to an anticipated temperature difference (At) the maximum length L would be as follows: | | |
| | | Fig. 1 | | |
| | | |
| | | -max. 80 r<\-*\* | | |
| | | fixpoint hangers | | |
| | | |
| | | |
| | | — transfer guides | | |
| | | T DSL | | |
| | | \ I end cap line feed | | |
| | | end feed | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | At 40° C = 160 m At 45° C = 140 m At 50° C = 120 m | | At 60° C = 100 m At 80° C = 80 m At 100° C = 60 m | | |
| | | Fig. 2 | | |
| | | |
| | | |
| | | | | | | | | | | | | <-max. 80 m->- | h- L-*1 crane track | K- L -> | -«-max. 80 m-> | | | | | | ■ — | | | | | ** | FPL/Cu | — Al | \ DSL^ ** | FPL/Cu | | | | | | | | | | | | |
| | | When in doubt regarding position and number of expansion joints please consult the factory for layout plans. | | |
| | \ | |
| | | |
| | | |
| | | |
| | | end cap | | |
| | | Mine feed | | |
| | | end cap Powerail fixpoint hanger | | |
| | | |
| | | |
| | | |
| | | Feeding No extra feeds required as the Powerail is not interrupted. | | |
| | | |
| | | Collectors No extra collectors required. Installation The expansion joint integrated in the one meter powerail section is installed on sliding hangers in the center between two anchor points of the copper conductors. The gap dimension "a" is factory set to 30 mm, suited for a temperature of +5° C up to +30° C during installation. | | |
| | | Anchor points for copper conductors (** Î ) | | |
| | | |
| | | | | | | | | | | | | | LSV | LSVG | | | | Type | No. of cond. | Cat.-No. | Type | No. of cond. | Cat.-No. | | | | FPL/Cu | 4 & 5 | 194 530 | FPLG/Cu | 6 & 7 | 183 830 | | | | FPL/Cu | 6 & 7 | 194 540 | FPLG/Cu | 8 & 9 | 183 840 | | | | | | | FPLG/Cu | 10 & 11 | 183 850 | | | | | | | | | | | | | |
| | | |
| | | |
| | | When in doubt - please consult the factory. | | |
| | | |
| | | 19 | | |
| | | * Above sections come ready assembled on 1 m Powerail and are a part of the system length. | | |
| | | |
| | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |