Installation on Oil Heating Unit (GL28KVB)
|
|
|
|
|
|
|
|
|
The G-series units can be installed on heating units,
complète with double electric heaters and double control valves.
These heating units are used in a large numberof applications. 1-ULTRAgearpump (10
2-Suction line 3-Discharge line 4-Motor
5-Flow control valve 6-Servo motor 7-Electric heater 8-Fluid meter 9-Filter
10-Fuel oil feeding
|
|
|
|
|
|
|
|
|
|
Usually these heating units are used if there are big gear pump thatmust be heated with diathermic oil. For example these units are installed on bitumenplant to provide its heating. If you are interested in, take a look at N-series application pages
|
|
|
|
|
|
|
|
|
|
|
|
|
Installation as Transfer Pump (GL300KV)
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
The G-series pumps can be used to transfer fluid from one tank to another such as from a tanker to drums. As example, the pump can move a fluid from a tanker to barrels or drums. Also, the pump can be used in the same configuration to pump fluid from barrels or drums to a tankerjust reversing the rotation sensé ofthe motor.
|
2-Discharge line 3-Suction line
COUNTER CLOCK WJSE ROTATION
2-Suction line 3-Discharge line . 4-Mot or I 5-Tanker m 6-Barrels
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|