| | | COLOR Stonres RTZ is available in 15 standard colors and an extensive color palette. Refer to the Stonres RTZ Color Sheet. SUBSTRATE PREPARATION Proper preparation is critical to ensure an adequate bond. The substrate must be relatively level, deviations of more than 1/8 inch per foot may result in irregularities which will require patching. The substrate must be dry and free of all wax, grease, oils, fats, soil, loose or foreign materials and laitance. Laitance and unbonded cement particles must be removed by mechanical methods, i.e., abrasive blasting or scarifying. Other contaminants may be removed by scrubbing with a heavy-duty industrial detergent (Stonkleen DG9) and rinsing with clean water The surface must show open pores throughout and have a sandpaper texture. For recommendations or additional information regarding substrate preparation, contact Stonhard's Technical Service Department. PRIMING The use of the Standard Primer/SL Primer system is required for all applications of RTZ. The procedure is as follows: Apply Standard Primer to the substrate. Next, apply the first coat of SL Primer Then, apply a second coat of SL Primer 30 minutes after beginning the first coat. Both the Standard Primer and first coat of SL Primer must be wet while applying each coat of SL Primer The primer system must be applied by squeegee and cure to a tack-free state before applying the Stonres RTZ. APPLYING Application of the Stonres RTZ system is accomplished as follows: 1. Stonres RTZ Base material is mixed just prior to use in accordance with prescribed directions. The base material is then screed rake applied and spike rolled to finish. 2. After a minimum of 20 hours curing time, sand the surface of | | RECOMMENDATIONS • DO NOT attempt to install material if the temperature of the Stonres RTZ components and substrate are not within 65 to 85T/I8 to 30°C. The cure time and application properties of the material are severely affected if the temperatures are outside of this range. • DO NOT use water or steam in the vicinity of the application. Moisture can seriously affect the working time and other properties. • The use of NIOSH/MSHA approved respirators and safety glasses is recommended. The use of a NIOSH approved partic-ulate respirator is required when sanding or grinding floor surfaces. • Avoid contact with all liquid materials as they may cause skin and/or eye irritation. Workers should cover hands with impervious gloves. • Use only with adequate ventilation. NOTES • Procedures for cleaning of the flooring system during operations can be found in the Stonhard Floor Maintenance Guide. • Specific information regarding chemical resistance is available in the Stonres Chemical Resistance Guide. • Material Safety Data Sheets for Stonres RTZ are available on line at www.stonhard.com under Tech Info or upon request. • A staff of technical service engineers is available to assist with installation or to answer questions related to Stonhard products specifically or flooring problems in general. • Requests for technical service or literature can be made through local sales representatives and offices or corporate offices located worldwide. | | |
| | | tia | ai ui uiuiueiiLai uaiiiiiges in ine use ui me sysier r literature at any time and without prior notice. | | s described, including any warranty of merchantability or fitness. Information contained here is for evaluation only. We further reserve the right to modify and change products | | |