See other catalogues for
Stoelting
You may also be interested in
Text version of the page
| | | | | | | | | | | | | | | | | | | | | | | | | | | |
| | | |
| | | The fundamental principal of lean manufacturing is the elimination of waste and cost. The Stoe lting A quaCe ll Parts W ashe r w as de signe d for Le an M anufacturing Environm e nts. | | |
| | | |
| | | A TOP TEN LIST OF AQUACELL FEATURES: | | |
| | | |
| | | • In-process cleaning • One person operation • Supports one-piece/small lot flow • Narrow width design for proper fit in a lean cell environment • Simplified design reduces both investment and down time | | |
| | | operator e box | | |
| | | |
| | | |
| | | Insulated Tank | | |
| | | |
| | | a FRONT VIEW | | |
| | | |
| | | • Designed to support the operator; allows operator to keep parts flowing smoothly with no interruptions. • Recirculating spray wash and air blowoff stages as standard. • Self-contained design. • Portable and flexible. • All stainless steel construction. | | |
| | | Bag | | |
| | | |
| | | -W*- SIDE VIEW | | |
| | | |
| | | |
| | | TOELTING Ta Polar Ware Company | | |
| | | |
| | | 502 Highway 67 • Kiel, Wisconsin 53042-1600 Tel: (920) 894-2293 • 800-545-0661 • Fax: (920) 894-7029 • E-mail: industrial@stoelting.com • Web site: www.stoelting.com | | |
| | | |
| | | 03/03 | | |
| | | |
| | | | | | | | | | | | | | | | | | | | | | | | | | | |