Snap Band Installation - Standard Filter Corporation - #1

/ 1


catalogue search
Snap Band Installation - Standard Filter Corporation
P. 01
Page:
Snap Band Installation - Standard Filter Corporation


See other catalogues for Standard Filter Corporation
You may also be interested in

Pressure gauge, Fabric, Solenoid valve, Venturi ejector, Ejector


Text version of the page
Standard Filter Corporation 5928 Balfour Court • Carlsbad, California 92008 Phone: 760.929.8559 • Fax: 760.929.1901 www.standardfilter.com Insert Filter bag through hole in cell plate. Hold bag just below snap ring while pushing through being careful not to scrape the bag. Snap Band Installation Pre-shape the snap band into a kidney bean shape Place the snap band groove into the cell plate setting the seam of the bag first. Release snap band. Make sure the seal is even and the bag does not spin within the cell plate. Workers should be familiar with and follow the manufacturers’ guidelines for Dust Collector Operation and Maintenance as well as applicable OSHA and MSHA guidelines for confined entry and equipment and electrical lockouts before attempting any work on a bag house.

pageCatalog pdf di En 2012-06-22-01