loading in progress... Please wait

www.seraphinusa.com
Seraphin Test Measures catalogue search   Go 
9 pages in the catalogue

Slip-on Unit

Slip-on Unit p 1
SERAPHIN ® SLIP-ON CALIBRATION UNIT OPERATING AND MAINTENANCE INSTRUCTIONS Seraphin ® Test Measure A Division of Pemberton Fabricators, Inc. Rancocas, NJ JULY, 2004 Seraphin® - 30 Indel Avenue –...
Slip-on Unit p 2
2 NOTICE PEMBERTON FABRICATORS, INC. (SERAPHIN ® DIVISION) SHALL NOT BE LIABLE FOR TECHNICAL OR EDITORIAL ERRORS IN THIS MANUAL OR OMISSIONS FROM THIS MANUAL. SERAPHIN ® MAKES NO WARRANTIES, EXPRESSED...
Slip-on Unit p 3
3 Description: The Seraphin ® Slip-on Designed to slip easily into the bed of a pick-up truck, Seraphin's Slip-On Volumetric Calibration Unit can speed the job of calibrating multiple fuel dispensing...
Slip-on Unit p 4
4 Prover Wetting Procedure :1.If the prover is clean and free of debris, fill the prover with liquid from the meter device being checked. Fill the prover until the amount on the meter reads the nomin...
Slip-on Unit p 5
5 5.Open the prover drain valve. Once the cessation of the main flow breaks, wait 30 seconds and then close the drain valve. NOTE: Ensure the tank gravity drain valve is closed when draining the prov...
see more pages
back

soc-pdf-mea pdf di En 2009-01-02-09