Leaflet EN - RBR-Computertechnik - #4

/ 4


catalogue search
P. 01
P. 02
P. 03
P. 04
Pages:


See other catalogues for RBR-Computertechnik

Text version of the page

Burner diagnostic with ecom-EN and ecom-AK

with a listing of the most frequent errors. The last pages all important monitoring times of the firing automate . On corresponding key order, the ecom-EN prints out a diagnostic protocol which can be used for documentation. A simple burner diagnostic is possible using the ecom-EN. He-reto the data sampled by the ecom-AK are sent via cable to the ecom-EN and illustrated in a clear arrangement on the display. The first page shows a graphic illustration of the operation stands of the burner . The next pages contain records of the burner error history

Operation stands of the burner Error history of the burner Printer • Thermal printer 58 mm Connections • Connection to ecom-GSK leak detector; connection gas pressure sensor • Serial interface for data transfer Data processing • Internal memory (4000 measured values) • Data exchange with PC programme (option) Transport
Monitoring times of the firing automate • Transport bag (option) • Transport case (option) Dimensions/Weight

Features and performance

• Dimensions (W x H x D): 190 x 160 x 75 mm • Weight: ca. 3,5 kg complete with sampling system* Others lengths available on request.

(tested and approved acc. to EN 50379-2 and 1

st

BlmSchV)

Measuring variables • O
2 ; CO; (NO as option); T-Gas; T-Air; differential pressure Calculation variables • CO
3 2 ; CO(U); NO
x ; efficiency; losses; lambda; dew point; mg/m , mg/kWh, O
2 reference Display • LCD-Display; ; 70 x 40 mm; max. 8 lines • Back-lit; graphic-capable Probe • Coaxial probe 220 mm* with triple-chamber hose 2.20 m* Preparation of measuring gas • Quick gas transport (measurement values promptly available) • Condensation trap with fine dust filter • Electronic condensate monitoring Safety • Temperature trend indication to locate core flow • CO shut-down without interruption of measurement • Fresh air flushing by CO exceeding • Fresh air purging after measuring operation

Consult below rbr agency for more information

rbr Messtechnik GmbH · Am Grossen Teich 2 · D-58640 Iserlohn · Telefon +49(0)2371/945-5 · Fax +49(0)2371/40305Internet www.rbr.de · E-Mail info@rbr.de

pageCatalog pdf di En 2012-06-22-01