PTTF Ultrasonic Product Brochure - PRESO - #4

/ 6


catalogue search
P. 01
P. 02
P. 03
P. 04
P. 05
P. 06
Pages:


See other catalogues for PRESO

Text version of the page
PT TF Transit Time Ultrasonic Flow Meter
Installation Considerations
1. Select the optimum mounting location on the piping system - a full pipe with at least 10 straight pipe diameters upstream and 5 pipe diameters downstream with no flow disturbances.
2. Apply couplant grease to the two surfaces of the transducers that contact the pipe.
3. Mount the flow meter or remote transducers onto the pipe and secure. On horizontal pipe, transducer mounting location should be approximately 45-degrees of the side of the pipe. On vertical pipes with upward
flow, radial orientation does not matter.
4. Connect and apply DC power.
5. Connect the 4-20 mA, frequency or both outputs to the monitoring system.
Acoustic Couplant Application
o
*
Integral Mount
S3ood location for mounting
Flow Meter Mounting Orientation
NO ,
YES
-inn
Remote Mount
J3ood location for mounting
J
Vertical Pipe Mount
Flow meter transducer can be mounted in any orientation
Remote Mount - Large Pipe
Remote Large Pipe Transducer Mounting Orientation
Km
45
<
45
45
Head-on view of pipe
4
www.preso.com

pageCatalog pdf di En 2012-02-07-15