SWIFTPAC™ TRANSPORTABLE POWER PLANI
Swiftpac Power Plants Provides Quick, Reliable Power. Installation Takes Less than 30 Days.
SWIFTPAC transportable power plants offer 25 - 60 MW of moveable power. Utilizing the proven PWPS FT8® technology, the SWIFTPAC transportable power plants are designed to provide quick, reliable power.
The package design includes a driver assembly all in an enclo­sure incorporating the gas generator, power turbine, exhaust col­lector box, inlet plenum and lube system. This factory-assembled module allows the SWIFTPAC transportable power plants to be generating power in less than 3 weeks after arriving on site.
Visit www.pw.utc.com for more technical information on the SWIFTPAC.
Pratt & Whitney Power Systems 1.866.POWERALL (1.866.7693725) (Outside USA: 1-860-565-0140) info@pw.utc.com
Rev 12.05
Benefits
• Best in Class Part Load Efficiency
• Reduced Site Setup Time
• Lower Site Cost
• Less Expensive Shipping
• Reduced Field Flushing
• Minimal Field Wiring Terminations
• No Field Welding of Piping
• Less Site Labor
• Standard & Repeatable Manufacturing Process
• Standard & Repeatable Installation Process
• Pre-Assembled & Tested
• Reduced Field Inventory
• Ease of Engine Checkout and Maintenance
• Operating Flexibility
Simple Cycle Performance
Natural Gas
SWIFTPAC 30
SWIFTPAC 60
Output (kW)
30446¡PI™
Heat Rate
(BTU / kW-hr)
9312
9266
Efficiency (%)
37
37
Exhaust Flow (lb/sec)
201
402
Exhaust Temp (°F)
895
895
US Transport Time
6 Days
6 Days
Foundation
2-3' Concrete
3' Concrete
Installation
3 Weeks
3 Weeks
NOx
25
25
Fuel
Dual
Dual
Frequency
50/60 HZ
50/60 HZ
ì1