Steam Traps - Pennant Engineering - #19

/ 101


catalogue search
P. 01
P. 02
P. 03
P. 04
P. 05
P. 06
P. 07
P. 08
P. 09
P. 10
P. 11
P. 12
P. 13
P. 14
P. 15
P. 16
P. 17
P. 18
P. 19
P. 20
P. 21
P. 22
P. 23
P. 24
P. 25
P. 26
P. 27
P. 28
P. 29
P. 30
P. 31
P. 32
P. 33
P. 34
P. 35
P. 36
P. 37
P. 38
P. 39
P. 40
P. 41
P. 42
P. 43
P. 44
P. 45
P. 46
P. 47
P. 48
P. 49
P. 50


See other catalogues for Pennant Engineering
You may also be interested in

Condensate drain, Valve, Drain, Air eliminator, Globe valve


Text version of the page
Untitled table.main {} tr.row {} td.cell {} div.block {} div.paragraph {} .font0 { font:7.00pt "Arial", sans-serif; } .font1 { font:8.00pt "Arial", sans-serif; } .font2 { font:9.00pt "Arial", sans-serif; } .font3 { font:10.00pt "Arial", sans-serif; } .font4 { font:12.00pt "Arial", sans-serif; } .font5 { font:12.60pt "Arial", sans-serif; } .font6 { font:13.00pt "Arial", sans-serif; } .font7 { font:21.00pt "Arial", sans-serif; } PT18 Thermodynamic Steam Traps for Universal Connector DESCRIPTION: Thermodynamic steam trap with universal connector provides a handy solution for maintenance and replacementwithoutdisturbingthe existingpiping. FEATURES: The universal connector, once installed, remains on the pipeline permanently. The trap itself is attached to the connectorbytwo bolts, enabling quick installation and replacement. The connector design facilitates vertical / horizontal installation or any angle in-between,regardlessofpipingconfiguration. Ideal for on/off discharge with tight shut off and no-bleed or "controlled" leakage in constant pressure / constant load applications. The trap is of stainless steel construction and integral seat design with hardened disc and seating surface. SIZES:DN15,20 CONNECTIONS: Universal flange connection suitableformounting on PU11 /PU11Yconnector Connectors are supplied in Screwed (NPT / BSPT / BSP), Socket weld connections. Non IBR1 / IBR approved Picture shows the PT18 trap fitted with a PU11 connector LIMITING CONDITIONS: PMA: Max. allowable pressure 42 bar(g) TMA: Max. allowable temp. 426 °C Maximum operating back pressure at the outlet should not exceed 80% of the inlet pressure. Minimum differential pressure for satisfactory operation 0.25 bar Cold hydro test pressure 84 bar(g) MAINTENANCE: The trap can be removed for repair or replacement without disturbing the connector piping connections. Complete isolation of the connector from both supply and return line is required before the trap is removed. The trap should be removed from the connector and inspected and cleaned periodically. IMPORTANT: The trap should be installed as close as possible to the linetobedrained. For new pipelines, ensure that the lines are properly flushed, prior to fitting the traps, to avoid strainer choke-up. INSTALLATION: The connector can be installed in horizontal or vertical lines. The connector face must be in a vertical plane. The trap should be fitted to the connector with its cap uppermost. Full-port isolating valves should be installed upstream and downstream ofthe connector. Indian Boiler Regulations

pageCatalog pdf di En 2012-05-22-31