cad

LA6 Signal Tower
8Pages

{{requestButtons}}

Catalog excerpts

LA6 Signal Tower - 1

To ensure correct use of these products, read the "Instruction Manual” prior to use. Failure to follow all safeguards can result in fire, electric shock, or other accidents.Specifications are subject to change without notice. PATLITE ECO PROJECT For the benefit of mankind and the earth, Patlite is committed to developing environmentally friendly products.

Open the catalog to page 1
LA6 Signal Tower - 2

A SIGNAL TOWER DESIGNED TO SHOW MORE SO YOU CAN DO MORE COMMON ON-SITE OCCURRENCES OUR PROCESSES HAVE CHANGED. We now need to reconfigure the color modules on our Signal Towers. OUR MACHINE LINE IS EXPERIENCING TOO MANY STOPPAGES. We need to make our workers better aware of machine status, so they can take quicker corrective measures. WE ARE EXPERIENCING DOWN TIME DUE TO MATERIAL MANAGEMENT. We need earlier notifications prior to materials completely depleting to avoid delays. PRODUCTION STOPPAGES ARE OCCURRING AS A RESULT OF UNEVEN WORKFLOW. Variations in work output is creating bottlenecks...

Open the catalog to page 2
LA6 Signal Tower - 3

ADVANCED OPTIONS TO SOLVE ANY APPLICATION Color Change Level Meter Monitoring IMPROVE VISIBILITY WITHOUT RECONFIGURING HARDWARE By programming the LA6 to a single, all-tier color arrangement, the equipment status can now be seen at a greater distance, improving awareness and response time. ■ Display up to21 different colors for different equipment statuses Status Condition By displaying current material levels, workers can more accurately respond to changes, reducing downtime. As material levels reach certain thresholds, the LA6 can provide earlier visual and audible notifications. ■...

Open the catalog to page 3
LA6 Signal Tower - 4

REDUCE BOTTLENECKS WITH A VISUAL TAKT SYSTEM Cycle Time Cycle Time Idle time or delays on the production assembly line is sometimes caused by variations in the rate of worker output. Due to high volumes of products to inspect, some defective products may be overlooked and pass inspection. IMPLEMENTATION MERIT IMPLEMENTATION MERIT With the LA6 visual Takt system, workers will be more aware of the progress of the entire line, minimizing delays, and resulting in a smoother work flow. Operation Complete With the LA6 internal timer function, inspectors are allotted proper time for each...

Open the catalog to page 4
LA6 Signal Tower - 5

OBTAIN EQUIPMENT INFORMATION FROM REMOTE LOCATIONS Remote Monitoring PROBLEM Tanks located in remote buildings tend to be overlooked until the tanks are completely depleted. Managers in remote offices need to monitor machinery statuses on the factory floor in real-time. IMPLEMENTATION MERIT IMPLEMENTATION MERIT The LA6 can be used as an economical level meter system, capable of alerting remote personnel of equipment changes in real-time. Outdoor Building 1 (Unmanned) Remote Monitoring With the LA6-POE’s built-in mirroring function, equipment status, Takt time, etc., can be communicated to...

Open the catalog to page 5
LA6 Signal Tower - 6

The LA6 alarm features a total of 11 sounds to match various applications. Voltage: 24V DC Direct Mount/Terminal (TN) Steel Pole with L-bracket/Cable (LJ) Voltage: 100-240V AC Direct Mount/Cable (LJ) Multi-function Switch for various setups BUZZER SOUND SETUP The built-in switch has four selectable settings for "Loud" (about 85dB) -> "Middle" (about 80dB) -> "Low" (about 75dB) -> "Off". The newly developed lens design efficiently diffuses LED light so that it is unmistakably visible, even from great distances. COLOR SETUP The built-in switch can also allow a manual selection of 9 colors to...

Open the catalog to page 6
LA6 Signal Tower - 7

■ Easy Setup Filer Edil CoftiffiuiiiGaliOrt lam □ »“ U E i* 05 dV ii GinEraJ Srtmg' il rawer Mada Seftmg Color Hit™ Cdlgf InHinj : toablE Setup timing in pattern changes with the editing software. fcrijup Svllmg) Bighlnsts time Sfun Setups for the individual group operation can be executed. Pattern change timing can be setup with the editing software. Maximum pattern display I 63 Patterns Maximum group number Contact Input Automatic Automatic 10 min. progress 30 min. progress 50 min. progress Determine thresholds for pressure / temperature, etc. 14 Pattern transition timing can be...

Open the catalog to page 7
LA6 Signal Tower - 8

■ Outer Dimensional Drawings ■ Wiring Red indicates the lead wire color (for Cable type models) * The lead wire color does not indicate the LED luminescence color. ■ | TN | Direct mount/Terminal ■ J Steel Pole [Pi 24V DC with L-bracketCable 24V DC Wiring (LA6/LA6-POE) * Be sure to check the wiring diagram of the PNP type transistor by visiting our website and viewing the comprehensive operation manual, etc. External Contact Classification Mode Change Pink It can be used for the smart mode when a signal is applied to the mode change line. For connector inputs, mode change is terminal...

Open the catalog to page 8

All PATLITE Europe GmbH catalogs and technical brochures

  1. PFH-BT

    2 Pages

  2. LS7

    2 Pages