| 1. Capacity is a static load at the out-end roller per single frame. 2. Mass is of single frame including mounting block. 3. When loading a die onto Pre-roller by crane or forklift, carry out as slow as possible. The loading speed should be below 50 mm/sec at max. loading capacity. 4. When extracting a die, pay attention not to damage the stopper of Pre-roller. The extracting speed should be below 100 mm/sec at max. loading capacity. |