Couplings - OEM - Parker Climate Systems Division - #9

/ 36


catalogue search
P. 01
P. 02
P. 03
P. 04
P. 05
P. 06
P. 07
P. 08
P. 09
P. 10
P. 11
P. 12
P. 13
P. 14
P. 15
P. 16
P. 17
P. 18
P. 19
P. 20
P. 21
P. 22
P. 23
P. 24
P. 25
P. 26
P. 27
P. 28
P. 29
P. 30
P. 31
P. 32
P. 33
P. 34
P. 35
P. 36
Pages:


See other catalogues for Parker Climate Systems Division
You may also be interested in

Valve, Check valve, Metering valve, Pipe fitting, Dryer filter


Text version of the page
Catalog OEM-1, Couplings / Page 9
Assembly Instructions
Step 1
After tubing or hose has been connected to adapters (1) and (12), install adapter
O-rings (2) and (11)* on adapters. Be sure O-rings are not twisted.
Step2
Generously lubricate adapter O-rings (2) and (11) with the system lubricant to pre­vent them from scuffing and tearing when coupling body is threaded on adapter.
Step 3
Adapter to S2 male coupling half con­nection.
A. Lubricate poppet face with system lubri­cant. Insert poppet valve assembly (3) into body (4). Tighten body (4) on adapter (1).
B. After body and adapter make metal-to-metal contact, torque to the value shown in the "Torque Values" table.
Step4
Adapter to S5 female coupling half con­nection.
A. Lubricate O-ring (9) liberally with system lubricant. Insert valve and sleeve assem­bly (10) into body (8). Tighten body (8) on adapter (12).
B. After body and adapter make metal-to-metal contact, torque to the value shown in the "Torque Values" table.
Step 5
Coupling connection.
A. Generously lubricate the gasket seal (5) on the 5400-S2 male coupling half with the system lubricant.
B. Thread the union nut (8) onto the S2 male coupling half. Tighten union nut to torque values shown in the "Torque Values"
table.
IMPORTANT - DO NOT rotate the S5 female coupling half body during connection.
C. After the coupling halves are seated, keep the bodies of the S2 male coupling half (4) and that of the S5 female coupling half (8) from rotating and tighten the union nut to the torque values shown in the "Torque Values" table.
IMPORTANT - DO NOT rotate the S2 or S5 coupling half body during connection.
Bulkhead Mounting — S2 Half
Install lock washer (6) on S2 half, insert S2 male coupling half through bulkhead, and tighten jam-nut (7) so that lock­washer teeth are fully compressed.
Note: Lock washer (6) must be between hex of S2 male half and bulkhead.
IMPORTANT - Generous lubrication is required for all gaskets and O-rings. Lubrication should match system oil and be compatible with refrigerant system.
* Specify O.D. Tubing size of adapter required in
16th of an inch.
Example:
-4 coupling with 3/8" O.D. tubing = 6/16 or -6. Part number is then 202208-6-4.
Accessories
Adapter — Braze
Dust Plug
Coupling Size
Part Numbers
Thread Size P
K]jDji
O-Ring
Brass
-4
22546-12
202208-4-4B
1/2-20
1/4
-8
22546-17
202208-8-8B
7/8-20
1/8
-12
22546-23
202208-10-12B
1-1/4 - 18
5/8
-16
22546-28
202208-14-16B
1-9/32 - 20
7/8
O-Ring Required
Dust Cap
AdapterSAE 37° (JIC)
Part Numbers
ESDI
Dust Cap and Dust Plug
Coupling Size
O-Ring
Brass
Steel
Thread Size P
Coupling Size
Part Numbers
-4
22546-12
202220-4-4B
202220-4-4S
7/16 - 20
1/4
Dust Cap
Dust Plug
-4
22546-12
202220-6-4B
202220-6-4S
9/16 - 18
3/8
with Gasket
with Gasket
-8
22546-17
202220-6-8B
202220-6-8S
9/16 - 18
3/8
-4
5400-S6-4
5400-S8-4
-8
22546-17
202220-8-8B
202220-8-8S
3/4 -16
1/2
-8
5400-S6-8
5400-S8-8 -12
22546-23
202220-10-12B
202220-10-12S
7/8 - 14
5/8
-12
5400-S6-12
5400-S8-12 -12
22546-23
202220-12-12B
202220-12-12S
1-1/16 - 12
3/4
-16
5400-S6-16
5400-S8-16 -16
22546-28
202220-16-16B
202220-16-16S
1-3/16 - 12
1
O-Ring Required

pageCatalog pdf di En 2012-05-22-31