Properties and planning for the EBK ducting systems
Planning
When planning an underfloor instal­lation with the EBK system, the fol­lowing criteria should be tested with regard to later use:
Installation
The flushfloor, closed EBK ducting system is laid, aligned and fixed on the raw screed. Couplers support the joints ofthe underfloor ducts and help to adjust the height. The height-ad­justment range is +20 mm.
To ensure the required floor load capacity and construction stability, the screed must be worked tightly up against the box. The ducting sections must also be supported with screed in the edge areas.
Number of cables to be laid and the required workplace connections Filling factor (as guide value for first filling, the filling factor related to the trunking cross-section should not be greater than 0.6)
Density ofthe connection grid Design and thickness ofthe screed
Load to be expected (traffic loads)
102 UFS
DirectIndustry's Virtual Technical Library: PDF Catalogue | Technical Documentation | Brochure | Manual | Industrial directory | Specifications | Characteristics
Search Go
page 1 p.1
page 2 p.2
page 3 p.3
page 4 p.4
page 5 p.5
page 6 p.6
page 7 p.7
page 8 p.8
page 9 p.9
page 10 p.10
page 11 p.11
page 12 p.12
page 13 p.13
page 14 p.14
page 15 p.15
page 16 p.16
page 17 p.17
page 18 p.18