MISIA ELECTRIC ROPE HOIST MA-MB-MC-MD-ME-MF-MG-MH-ML - Misia Paranchi - #1

/ 2


catalogue search
MISIA ELECTRIC ROPE HOIST MA-MB-MC-MD-ME-MF-MG-MH-ML - Misia Paranchi
P. 01
MISIA ELECTRIC ROPE HOIST MA-MB-MC-MD-ME-MF-MG-MH-ML - Misia Paranchi
P. 02
Pages:
MISIA ELECTRIC ROPE HOIST MA-MB-MC-MD-ME-MF-MG-MH-ML - Misia Paranchi


See other catalogues for Misia Paranchi
You may also be interested in

Hoist, Cable hoist, Electric hoist, Hoist trolley


Text version of the page
6 7 STANDARD MISIA MISIA ELECTRIC ROPE HOIST MA-MB-MC-MD-ME-MF-MG-MH-ML PERFORMANCES AND TECHNICAL DATA EXAMPLE OF HOIST IDENTIFICATION CODE Serial number Hoist type Max capacity Version: S2 - with 2 rope falls S4 - with 4 rope falls Hook travel P-S-T-Q-R Type:5 supported 5C1 suspended 3 monorail trolley, standard headroom 83 monorail trolley, low headroom 53 double rail trolley, supported hoist 53C1 double rail trolley, suspended hoist with two travel speeds N 1 standard hoisting speed V 1 fast hoisting speed NA 2 standard hoisting speeds/Aux. speed VA 2 fast hoisting speeds/Aux. speed M C 63 S4 T N / 5 (a) Hoists seldom lifting the maximum load and mostly reduced loads. Hoists lifting approx. with the same ratio maximum, middle and reduced loads. Hoists frequently lifting the maximum load and normally middle loads. Temporary service As foreseen in the FEM standards 9.681 and 9.682, electric brake motors for travel and lifting are designed and manufactured for intermittent duty in relation with the selected duty class. However, for example in case of long travel strokes or hook travel, it is possible that these intermittent duty rates cannot be observed. In these cases the hoist may be operated in temporary service, with the possibility to establish the running time taking into account the limit temperatures permissible for the motors. In these cases ensure that the motors do not exceed the number of starts and running time in compliance with the duty class selected based upon a.m. FEM standards (see table). Hoists regularly lifting loads near the maximum value Duty class Running time ŇTÓ Group Continuous running Max. number of subsequent FEM ISO time min. starts during the running time 1B m M3 1A m M4 2 m M5 3 m M6 Temporary service (high hook travel and long travels) 15 30 10 10 L1 Light duty L2 Middle duty L3 Heavy duty L4 Very heavy duty L1 - Light duty 6300 12500 L2 - Middle duty 3200 6300 L3 - Heavy duty 1600 3200 L4 - Very heavy duty 800 1600 FEM group 1A m 2 m Selection of the FEM group accordingly to the duty class and the total running time. Two parameters determine the duty class of the hoist: a) running time; b) kind of duty. Hoists travel speed (m/min.) Type 1 speed 2 speed 3 - monorail standard headroom 20 16 12 10 8 20/6,5 - 16/5,3 - 12/4 - - 83 - monorail low headroom 20 16 12 - - - 20/5 - 16/4 - 12/3 - 53 - double rail 20 16 12 10 - 20/6,5 - 16/5,3 - 12/4 - 10/3,3 Capacity FEM ISO Hoist Rope Lifting speed (m/min.) Hook travel (m) groups type falls 1 speed 2 speed (Kg) NĄ N V NA VA P S T Q R 800 3 m M6 MA 10 S2 2/1 8 12 8/2 12/2 - 8,5 12 19 26 1000 2 m M5 MA 10 S2 2/1 8 12 8/2 12/2 - 8,5 12 19 26 3 m M6 MA 20 S4 4/1 4 6 4/1 6/1 - - 6 9,5 13 3 m M6 MB 20 S2 2/1 8 12 8/2 12/2 - 9 12,5 19,5 26 2 m M5 MA 20 S4 4/1 4 6 4/1 6/1 - - 6 9,5 13 2 m M5 MB 20 S2 2/1 8 12 8/2 12/2 - 9 12,5 19,5 26 2500 3 m M6 MC 32 S2 2/1 8 12 8/2 12/2 - 10,5 14,5 22,5 30 3 m M6 MB 40 S4 4/1 4 6 4/1 6/1 - - 6 9,5 13 2 m M5 MC 32 S2 2/1 8 12 8/2 12/2 - 10,5 14,5 22,5 30 2 m M5 MB 40 S4 4/1 4 6 4/1 6/1 - - 6 9,5 13 3 m M6 MD 50 S2 2/1 8 12 8/2 12/2 - 8,5 12 19 26 3 m M6 MC 63 S4 4/1 4 6 4/1 6/1 - - 7 11 15 2 m M5 MD 50 S2 2/1 8 12 8/2 12/2 - 8,5 12 19 26 2 m M5 MC 63 S4 4/1 4 6 4/1 6/1 - - 7 11 15 3 m M6 ME 80 S2 2/1 8 - 8/2 - - 14,5 19,5 26,5 33,5 3 m M6 MD 100 S4 4/1 4 6 4/1 6/1 - - 6 9,5 13 2 m M5 ME 80 S2 2/1 8 - 8/2 - - 14,5 19,5 26,5 33,5 3 m M6 MF 100 S2 2/1 6 - 6/1,5 - 20 32 48 - - 2 m M5 MD 100 S4 4/1 4 6 4/1 6/1 - - 6 9,5 13 2 m M5 MF 100 S2 2/1 6 - 6/1,5 - 20 32 48 - - 12500 3 m M6 ME 160 S4 4/1 4 - 4/1 - - 7 9,5 13 16,5 2 m M5 ME 160 S4 4/1 4 - 4/1 - - 7 9,5 13 16,5 3 m M6 MF 200 S4 4/1 3 - 3/0,75 - 10 16 24 - - 2 m M5 MF 200 S4 4/1 3 - 3/0,75 - 10 16 24 - - 1A m M4 MG 250 S4 4/1 2,5 - 2,5/0,6 - 10 16 24 - - 2 m M5 MH 320 S4 4/1 2 - 2/0,5 - 10 12 15 22 - 1A m M4 MH 320 S4 4/1 2 - 2/0,5 - 10 12 15 22 - 2 m M5 ML 400 S4 4/1 1,5 - 1,5/0,37 - 10 12 15 22 - 40000 1A m M4 ML 400 S4 4/1 1,5 - 1,5/0,37 - 10 12 15 22 - N.B. The lifting and travel speeds refer to a frequency of 50Hz 1600 2000 3200 4000 5000 6300 8000 10000 16000 20000 25000 32000 Technical data

pageCatalog pdf di En 2012-05-22-31