TEST FACILITY
QUALITY ASSURANCE
MAN TURBO owns and operates different tesrbeds fo' tuibo-rnac.ninery ir crie- to exsri.te factory acceptance tests. One test centre for industrial compressors, steam, process-gas and indus­trial-gas turbines as well as tor individual components has been integrated into the production shops.
MAN TURBO'S Quality System co-piics with ISO SOU I ard s the basis for the reliability of the company'', hkjh-qi.alty producTS. The QA division, which reports to the Chairman of the Executive Boarc. initiates, coordinates, and monitors all activities affecting a.jaity, whlc also ssuin;;i. and contrail ng the- oompli-ance with, QA Manuals and Procedures, such as: Design
Materia piocjieme.-.t Production planning Faci icalbr
■ Functional tests Procedural qualifications
Calibration of gauges and test equipment.
Main points of an inspection plan (or a machine train in an
Testing of specimens taker from workplaces of machine components
Ultrasonic examination aft;::' rouan machining and finish-machining
Magnetic-particle testing Dye-penetrant examination Radiography
Dimensional and visua examination
■ Heat stability testing Hydrostatic testing Overspeed testing
■ Run-out measurement on rotors : Clearance measurements
Machines/machine traini a;';: completely a; assembly bay arri jubseri.ie.nlly tianrrered to the adjacent te
id connection
to the permanent piping systems (steam, air water, oil), ail kinds of tests to DINA/DI/ASME/API can be conducted:
■ mechanical testing of the individual machines mechanical testing of a complete machine Iran thermodynamic tesling with ,.ir and other gases in open or closed loop systems.
The dr vers used during testing are either those supplied under a particular contract or the various test stand drivers which are avnibhls. .ft.:
■ an 1SMW condensing steam turbine
one 6.5 MW and two 2.5 MW variable-speed motors which can. if necessary, be coupled ogether.
n 2C0en additional pa;:-...,
It is now possible il necessary to w Modules up to 600 tonnes are by r
n up to three mac /er 4400 square rr
Two cranes, each capable of lifting o0 ISO tonnes, and with a crane hook height of over 17 metres, will guarantee tine neces­sary flexibilty in the machine assembly and testing in the future.
test bed includes a coolinc water creuit with three coolini rs, and a 20 MW electrical power supply in addition to thi " supply (50 bar, 500 °C, 55 t/h).
DirectIndustry's Virtual Technical Library: PDF Catalogue | Technical Documentation | Brochure | Manual | Industrial directory | Specifications | Characteristics
Search Go
page 1 p.1
page 2 p.2
page 3 p.3
page 4 p.4
page 5 p.5
page 6 p.6
page 7 p.7
page 8 p.8
page 9 p.9
page 10 p.10
page 11 p.11
page 12 p.12
page 13 p.13
page 14 p.14
page 15 p.15
page 16 p.16
page 17 p.17
page 18 p.18
page 19 p.19
page 20 p.20
pdf-page pdf di En 2008-11-47-23