| | | Serial production provides flexibility Serial production of SM Winches, ending with full load factory testing of every hoist, certifies the functionality of all machinery and equipment combinations, and enables the product to be adapted to your specific production process. Smaller runway reduces construction costs The small space requirement and the lightweight, durable construction of the SM Winch lead to optimization of the work area to the users benefit. Trolleys constructed with a four-wheel or six-wheel bogie system and true vertical lift ensure load is evenly distributed along the crane girders. | | Compared to any other type of hoisting trolley, the SM Winch enables a reduction in the structural requirements of rails, runway beams and columns, and in the overall height of the building. Consequently, the SM Winch begins its own payback by reducing building construction costs. Higher hoisting capacity in modernizations In modernization of old cranes, replacement of the original hoisting machinery with the SM Winch often makes it possible to increase crane capacity by 10-20 %. This is due to the low weight of the trolley, a uniform load distribution to the steel structures and small overall dimensions. The rail gauge of the SM Winch can be tailored to each case. Hoisting speed can be doubled The SM Winch concept offers multiple solutions for fast auxiliary hoisting. The Extended Speed Range (ESR) feature of the DynAHoist frequency converter control allows the hoisting speed to be doubled when handling lighter loads. Alternatively a separate auxiliary hoist can be attached using the tow trolley. | | |