Datasheet - K3VL B Series - Kawasaki Precision Machinery - #29

/ 53


catalogue search
P. 01
P. 02
P. 03
P. 04
P. 05
P. 06
P. 07
P. 08
P. 09
P. 10
P. 11
P. 12
P. 13
P. 14
P. 15
P. 16
P. 17
P. 18
P. 19
P. 20
P. 21
P. 22
P. 23
P. 24
P. 25
P. 26
P. 27
P. 28
P. 29
P. 30
P. 31
P. 32
P. 33
P. 34
P. 35
P. 36
P. 37
P. 38
P. 39
P. 40
P. 41
P. 42
P. 43
P. 44
P. 45
P. 46
P. 47
P. 48
P. 49
P. 50


See other catalogues for Kawasaki Precision Machinery

Text version of the page
Installation (continued)
Mounting the Pump Vertically (shaft up)
For applications requiring vertical installation (shaft up) please remove the air bleed plug and connect piping as shown in the illustration below.
The oil level in the tank should be higher than the pump-mounting flange as shown in illustration [a] below. If the oil level in the tank is lower than the pump mounting flange then forced lubrication is required through the air bleed port 1 ~ 2 l/min.
When installing the pump in the tank and submerged in the oil, open the drain port and air bleed port to provide adequate lubrication to the internal components.
When installing the pump outside the tank run piping for the drain and air bleed ports to tank (see illustration [c]). If the drain or air bleed piping rise above the level of oil (see illustration [b]) fill the lines with oil before operation.motor to your national standard is not exceeded.
pipe for air bleeding
min. oil level
il rh
check valve_ cracking pressure 0.1 bar
pipe for draining
air bleeder plug port
Dr-
HT
drain port
Dr
Dr
IS
[a]
[b]
[c]
A check valve with cracking pressure of 0.1 bar should be fitted to the case drain line as shown. Recommended Kawasaki check valves are as follows: (refer to Kawasaki industrial valve information - data sheet C1001)
Model
Recommended Kawasaki check valve
K3VL45/60
C10G - 10/01-*
K3VL80
C15G - 10/01-*
K3VL112
C15G - 10/01-*
K3VL140
C15G - 10/01-*
K3VL200
C15G - 10/01-*
Kawasaki
Hydraulic Products
Model K3VL
Page 29.
Data Sheet P-1002/02.09

pageCatalog pdf di En 2012-05-19-10