You may also be interested in
Anaerobic adhesive, Silicone, Epoxy adhesive, Two-component adhesive, RTV silicone adhesive
Text version of the page
Technical Data Sheet1/28/2005FlexaneŽ Fast Cure Rubber Repair Putty - 15203 FlexaneŽ Fast Cure Rubber Repair PuttyDescription: A fast-curing, flexible urethane for repairing rubber equipment. Intended Use: Repair worn or damaged rubber equipment; form protective linings in equipment subject to wear, impact, abrasion, vibration, expansion, and contraction. Product features:Typical PhysicalProperties: Limitations: None ColorMix RatioMixed Viscosity% Solids by VolumeSpecific Volume Cured ShrinkageMaximum Operating TemperatureCoverage / lbCured HardnessDielectric Strength Tensile StrengthTear ResistanceMaximum ElongationAbrasion Resistance Functional Cure Time Light Duty ServicePot Life Black80:20Thixotropic paste10023.5 in.(3) /lb. 0.0014 in./in.Dry: 180°F; Wet: 120°F94 sq.in./lb. @ 1/4"87A350 volts/mils 2,400 psi 275 pli500%220mg loss per 1,000 rev. (CS17 wheel/1K cycles 16 hrs. 2 hrs.8 min. @ 75°F Technical data should be considered representative or typical only and should not be used for specification purposes. Cured 7 days @ 75° F TESTS CONDUCTED Surface Preparation: For METAL SURFACES, thoroughly clean area to be repaired, rebuilt, or lined with DevconŽ Cleaner Blend 300. Remove any oil, grease, or dirt. Roughen surface by grinding with a coarse wheel or an abrasive disc pad. To prime this surface, apply a coat of Devcon FL-10 Primer and allow to dry tack-free for 15 minutes. If the metal surface requires maximum tear resistance or is exposed to moisture, or if submerged in water, use DevconŽ FL-10 and DevconŽ FL-20 Primer.For RUBBER SURFACES, thoroughly clean area with an abrasive pad and DevconŽ Cleaner Blend 300. Surface can also be roughened with a grinding wheel so that it is coarse and free from oil and dirt that may clog the "pores" of the rubber. Wipe or roughen surface with Cleaner Blend 300 until the cloth no longer picks up the color of the rubber. The rubber should appear new or deeper in color. To prime this surface, apply a coat of DevconŽ FL-20 Primer and allow to dry tack- free for 15-20 minutes. Use DevconŽFL-40 Primer on "hard-to-bond" rubber surfaces as this gives ultimate peel resistance. Multiple coats may be necessary for porous rubber surfaces.For MAXIMUM ADHESION, sandblast the surface with an angular abrasive until a minimum depth profile of 2-3 mils is met. Blast to near-white finish specification SSPC-SP5 (Steel Structure Painting Council). Prime surface immediately after sandblasting to prevent oxidation. Mixing Instructions: ---- To ensure proper cure speeds and hardness, mix Flexane at a temperature between 65°F-85°F. ----1.Add hardener to resin.2.Vigorously mix with screwdriver or spatula for two minutes, while continuously scraping material away from sides and bottom of container. NOTE: Flexane putties will thicken rapidly during these first two minutes of mixing, but this DOES NOT mean that the polymer is curing. 3.Transfer the mixed material to the plastic container (included in kit).4.Wipe spatula clean, and stir again for two more minutes. 5.Continue to mix until a uniform, streak-free consistency is obtained. FOR 4LB. UNITS:Use a propeller-type Jiffy Mixer Model ES on an electric drill. Cure Shrinkage ASTM D 2566Tear Resistance ASTM D 624Maximum Elongation ASTM D 412Dielectric Strength, volts/mil ASTM D 149Cured Hardness Shore D ASTM D 2240Tensile Strength (Urethanes) ASTM D 412 ITW Devcon, 30 Endicott Street, Danvers, MA 01923 Tel:(978) 777-1100 Fax:(978) 774-0516 www.devcon.com |
|