Assembly instructions for SAMURAI FASTAF - HEMA Maschinen- und Apparateschutz - #1

/ 3


catalogue search
Assembly instructions for SAMURAI FASTAF - HEMA Maschinen- und Apparateschutz
P. 01
Assembly instructions for SAMURAI FASTAF - HEMA Maschinen- und Apparateschutz
P. 02
Assembly instructions for SAMURAI FASTAF - HEMA Maschinen- und Apparateschutz
P. 03
Pages:
Assembly instructions for SAMURAI FASTAF - HEMA Maschinen- und Apparateschutz


See other catalogues for HEMA Maschinen- und Apparateschutz

Text version of the page
ASSEMBLY INSTRUCTIONS
Mounting horizontal-transverse with Helm guidance rail
Assembly instructions
■ For the correct assembly of SAMURAI bellows these instructions must be followed carefully, otherwise correct function cannot be guaranteed.
■ Special attention should be paid to the correct assembly of the upper rail (Helm rail system) and to the customer's own top an bottom guidance systems
Detail "Y" shows the upper area of the mounting bracket and the customer's own guidance plate, detail "Z" shows the lower guidance system (diagram below).
Lamellas compressed
Customer guidance plate
20 - 50 mm
Helm guidance rail, profile 100 not included in scope of delivery
roller bearing 019 resp. 22
support plate
extension limiter
cd u с
cd
га и
"cd E ra
Y 1:2.5
о "cd
DD
50
50
123
cd u с
га
_çd
и
Z 1:2.5
Customer guidance plate
НЕМА
HEMA
Maschinen- und Apprateschutz GmbH Seligenstädter Straße 82 D-6300 Seligenstadt
Phone: (+49)06182/773-0 Fax: (+49)06182/773-35
E-Mail: info@hema-schutz.de
Internet: www.hema-schuz.de
rrav
HEMA.Tailor-made Protective Systems

pageCatalog pdf di En 2012-05-21-25