Catalog - GECHTER - #29

/ 56


catalogue search
P. 01
P. 02
P. 03
P. 04
P. 05
P. 06
P. 07
P. 08
P. 09
P. 10
P. 11
P. 12
P. 13
P. 14
P. 15
P. 16
P. 17
P. 18
P. 19
P. 20
P. 21
P. 22
P. 23
P. 24
P. 25
P. 26
P. 27
P. 28
P. 29
P. 30
P. 31
P. 32
P. 33
P. 34
P. 35
P. 36
P. 37
P. 38
P. 39
P. 40
P. 41
P. 42
P. 43
P. 44
P. 45
P. 46
P. 47
P. 48
P. 49
P. 50


See other catalogues for GECHTER
You may also be interested in

Tool, Toggle press, Pneumatic press, Crimping press, Cut-off tool


Text version of the page
GECHTER Press force monitoring for pneumatic aided manual toggle presses HKPL MS + MC
*****
BEST
GECHTER
The GECHTER MS00 system offers the following instructions for the operator:
A An acoustic signal is audible. The Press Motion Control blocks the return stroke immediately af­ter error detection. The part cannot be removed. The signal has to be acknowledged. The block is released for the return stroke to take place, and the production process can be resumed.
B An acoustic signal is audible. The work move­ment control does not block the press from further operation until after the return stroke. The signal has to be acknowledged. The block is released, and the production process can be resumed.
C If the components are highly sensitive, an acknowledgment function can optionally be activated with a key switch. The key switch is operated by a superior member of staff to enable the further work process. At the same time, the controlled treatment of the "bad part " is also ensured.
HKPL-MC, Press Motion Control Control for pneumatic aided manual toggle presses HKPL-MC
Use the MS00 measuring results to control the continuous work movement of the operating per­sonnel with the utmost efficiency. Preconditions:
- If the measuring results are correct, the work movement must not be disturbed, and the lever must be operated quickly in the manufacturing process.
- If the measuring results are incorrect, the work movement must be interrupted and the operator instructed to recognize bad parts and remove them from the manufacturing process.
A practical example:
On the basis of the measured values, a press inserting process is classified as NOT OK by the MS00 measuring system.
HKPL-MS, manual toggle press including press force monitoring (force-displacement) with press motion sequence control
To turn a press into an HKPL-MC press, a Press Motion Control (mechanical module) and control electronics are integrated into the display unit and added to the HMS components
6. Displacement sensor for additional displace­ment measuring (no picture available)
7. Press Motion mechanical module (no picture available)
For both HMS and HMC, the following components and services are available as options:
8. PC software, extended version with graphic display and license (no picture available)
9. Additional housing for MS00A, with red lamp and key switch for acknowledgment
10. External calibration in a DKD-certified measur­ing laboratory (no picture available)
11. For further accessories see standard HKPL presses on page 26-27
6
Note:
I. For the types LP MS + MC, a center offset eccentricity of the holding fixture bore forward is existing.
II. The daylight is lower compared with the basic machines.
See relevant table.
GECHTER GmbH • Hannelore-Gechter-Str. 2 • D-91074 Herzogenaurach • Phone +49 (0)9132 7473-0 • Fax: +49 (0)9132 7473-710 • E-Mail: verkauf@gechter.com | 29

pageCatalog pdf di En 2012-05-22-29