Product overview - FlexLink - #22

/ 22


catalogue search
P. 01
P. 02
P. 03
P. 04
P. 05
P. 06
P. 07
P. 08
P. 09
P. 10
P. 11
P. 12
P. 13
P. 14
P. 15
P. 16
P. 17
P. 18
P. 19
P. 20
P. 21
P. 22
Pages:


See other catalogues for FlexLink
You may also be interested in

Sorter, Palletizer, Belt conveyor, Monorail conveyor, Rail


Text version of the page
Maintenance Maintenance System maintenance Introduction The following section is designed to offer assistance for your planned maintenance schedule. It may become evident that the suggested maintenance intervals can be extended to accommodate your local environmental conditions. Maintenance of the FlexLink conveyor systems should only be carried out by competent persons, who are familiar with FlexLink equipment. If there is any doubt as to the most suitable procedure for maintenance, consult your FlexLink supplier. Non FlexLink equipment Equipment and components which are not from the FlexLink family of products should be maintained and serviced in accordance with their respective manufacturer’s instructions. Safety considerations Before starting any maintenance on your FlexLink equipment, the following safety instructions must be observed: •All electricity must be switched off. •Make sure that the motor switch is also switched off and locked in the “off” position. •Pneumatic and/or hydraulic power must be disconnected and any pressure accumulation released. •Products being transported should, if possible, be removed from the conveyor chain. •Staff affected must be informed that maintenance work is being undertaken. Warning Do not climb onto the equipment.

pageCatalog pdf di En 2012-05-22-29