Maintenance
Maintenance
System maintenance
Introduction
The following section is designed to offer assistance for your planned maintenance schedule. It may become evident
that the suggested maintenance intervals can be extended to accommodate your local environmental conditions.
Maintenance of the FlexLink conveyor systems should only be carried out by competent persons, who are familiar with FlexLink equipment. If there is any doubt as to the most suitable procedure for maintenance, consult
your FlexLink supplier.
Non FlexLink equipment
Equipment and components which are not from the FlexLink
family of products should be maintained and serviced
in accordance with their respective manufacturer’s instructions.
Safety considerations
Before starting any maintenance on your FlexLink equipment,
the following safety instructions must be observed:
•All electricity must be switched off.
•Make sure that the motor switch is also switched off and locked in the “off” position.
•Pneumatic and/or hydraulic power must be disconnected
and any pressure accumulation released.
•Products being transported should, if possible, be removed from the conveyor chain.
•Staff affected must be informed that maintenance work is being undertaken.
Warning
Do not climb onto the equipment.
|
|