| 2) Insert Fast Heat Tip tool Ml 002 (Pinpoint) or Ml 003 (Sprue) provided over/into tip. Use a standard 1/4" Allen socket for Pinpoint tips, or 15mm socket for Sprue tips, and turn counter-clockwise to loosen. Installation 1) Place nozzle in "V" block and secure it firmly at the nozzle head. 2) Insert Fast Heat Tip tool Ml 002 (Pinpoint) or Ml 003 (Sprue) provided over/into tip. 3) Apply anti-seize sparingly onto male threads of tip. Note: excess anti-seize may contaminate the resin being processed. 4) Use a standard 1/4" Allen socket for Pinpoint tips or 15mm socket for Sprue tips and install tip by turning clockwise. 5) Torque to 30 ft./lbs. (41 Newton-Meters) Component Disassembly/Assembly Disassembly 1) Remove "Retaining Ring" using Retaining Ring Pliers. 2) Remove heater by hand. 3) Remove thermocouple by sliding it out of the T/C slot on the body. Assembly 1) Insert pre-bent thermocouple into T/C slot until thermocouple reaches the end of the slot. 2) Slide heater over T/C and body by hand, making sure to place heater wires in the same position as the thermocouple wires. 3) Install "Retaining Ring" using Retaining Ring Pliers. Power Requirements « 240 Volts AC - 1 5 amp fuse ■ Grounding - Fast Heat nozzles do not require any additional grounding wire. The nozzles are grounded through the bodies of the components. • WARNING* | There must be a ground present between the Mold "Hot Half" and the temperature control system or damage may occur to the nozzle, thermocouple and/or temperature control system |